id summary reporter owner description type status priority milestone component resolution keywords cc processors 373 EU10/03 & EUFAR10/01, flight day 238c/2010, Kis Balaton iopa anch "Data location: ~arsf/workspace/EU10_03-2010_238c_Kis_Balaton Data arrived from ARSF via SATA disk Q on 15/09/2010. However missing IPAS and LiDAR data on disk Q and on thelma delayed unpacking until 06/10/2010. Scientific objective: Lake Balaton provides an ideal area for testing emerging algorithms on retrieval of in-water constituents and on mapping bloom-forming cyanobacteria using in-situ radiometric, airborne and satellite data. Priority: a5 - the data set as a whole is listed as a5 due to it being part of EU10/03, however the PI of EU10/03 has lowered the LiDAR priority to a4m, and therefore LiDAR stands with a priority of a4h due to being part of EUFAR10/01. PI: A. Tyler (EU10/03) & A. Zlinszky (EUFAR10/01) When data is processed it should be dispatched to '''both PIs individually''' for their respective projects. This data needed to be split into 238c and 238d, there was already a logsheet for each distinct set of data. The reason they needed splitting was that the first set of data (238c) is part of 2 projects (EU10-03), whereas the second (238d) only of 1 (EUFAR10-01). Originally they were both came from ARSF Ops as 238c. '''Note''': Data is currently symlinked from ~arsf/arsf_data/2010/flight_data/archive_overflow and when this is resolved the symlinks will need to be re-directed. == Sensors: == * Eagle (27/10/2010 & 28/10/2010) * Hawk (28/01/2011) * Leica LIDAR * Digital Photography (27/10/2010 & 28/10/2010) " flight processing assigned alpha 5 Processing: general