Opened 16 years ago
Last modified 7 years ago
#233 closed flight processing
GB08/02, flight day 078a/2009, Delamere Forest — at Version 26
Reported by: | jatt | Owned by: | knpa |
---|---|---|---|
Priority: | alpha 4 high | Milestone: | 2009 Data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by knpa)
Data location: ~arsf/arsf_data/in_progress/2009/flight_data/uk/GB08_02-2009_078a_Delamere
Data arrived from ARSF via SATA N on 30th March 2009.
Scientific details: /users/rsg/arsf/arsf_data/2008/ARSF_Applications/GB_and_NL/GB08-02 Application and Science Case.pdf
Priority: a4H
PI: Prof Mark Danson
Sensors:
- Eagle (13/11/2009)
- Hawk (13/11/2009)
- ALS-II Lidar (22/03/2010)
- Photography (07/01/2010)
Quicklook
TBD.
Change History (26)
comment:1 Changed 16 years ago by jatt
- Owner mggr deleted
comment:2 Changed 16 years ago by mark1
comment:3 Changed 15 years ago by mggr
- Type changed from task to flight processing
comment:4 Changed 15 years ago by knpa
- Owner set to knpa
- Status changed from new to assigned
comment:5 Changed 15 years ago by knpa
No boresight figures for this date (or indeed any prior to day 133 in '09), only given as 'variable'.
comment:6 Changed 15 years ago by knpa
- Owner knpa deleted
- Status changed from assigned to new
comment:7 Changed 15 years ago by knpa
- Priority changed from alpha 5 to alpha 4 high
comment:8 Changed 15 years ago by mggr
- Component changed from ARSF to Processing: general
comment:9 Changed 15 years ago by emca
- Owner set to harg
comment:10 Changed 15 years ago by harg
Hawk flightline 4 (SWIR078-09-4) had no .hdr file. I have made a "fake". The line number is somewhat off: there should be a non-natural number of lines, so rounded down.
comment:11 Changed 15 years ago by harg
Lack of dark frames therefore radiometric values are an estimate rather than real data. Dark frames taken from hawk line 3.
comment:12 Changed 15 years ago by harg
The hyperspectral data is ready for delivery checking.
comment:13 Changed 15 years ago by mark1
- Owner changed from harg to mark1
comment:14 Changed 15 years ago by mark1
Checked data located at ~airborne/workspace/GB08_02-2009_078a_Delamere/delivery/20091028/GB08_02/
Have removed txt and doc versions of logsheet and replaced with pdf in delivery.
Edited readme file to include project code, flight line numbers, typos corrected.
Example commands tested and work ok, all level 1 files open and look good.
Ready for delivery.
comment:15 Changed 15 years ago by harg
Boresight values for Eagle and Hawk:
Pitch: Roll: Heading: e1: 0.15 -0.63 0 e2: 0.07 -0.67 0.27 e3: -0.1012467 -0.665408 -0.00117264571 e4: -0.085899928 -0.605906 -0.000327635087 h1: 0.0639243 0.201953 -0.28800340 h2: 0.03092585 0.08278325 -0.92657365 h3: -0.05 0.181 0 h4: 0.25 0.3 0
comment:16 Changed 15 years ago by harg
For Eagle and Hawk, GPT and SCT offsets both 0.0 in all cases.
comment:17 Changed 15 years ago by mark1
Data has been rsynced back to ~arsf/arsf_data/2009/flight_data/uk/GB08_02-2009_078a_Delamere/
comment:18 Changed 15 years ago by mark1
- Owner changed from mark1 to harg
comment:19 Changed 15 years ago by harg
The Eagle and Hawk data for this project have been delivered this morning (13/11/09) to Professor Mark Danson of Salford University in three DVDs.
comment:20 Changed 15 years ago by mark1
- Description modified (diff)
Digital Photography dispatched to M Danson on 07/01/2010
comment:21 Changed 15 years ago by mark1
rsynced photograph delivery to
~arsf/arsf_data/2009/flight_data/uk/GB08_02-2009_078a_Delamere/
comment:22 Changed 15 years ago by mark1
LiDAR data has been processed and is ready for delivery check at:
~airborne/workspace/GB08_02-2009_078a_Delamere/delivery/20100309/GB08_02
comment:23 Changed 15 years ago by emca
Delivery check complete. Loaded ascii files in LAG and the data looks good.
LIDAR data ready for delivery.
comment:24 Changed 15 years ago by mark1
- Description modified (diff)
LIDAR data dispatched to PI on 22/3/2010
comment:25 Changed 15 years ago by mark1
- Component changed from Processing: general to Archiving
LIDAR data rsynced to:
~arsf/arsf_data/2009/flight_data/uk/GB08_02-2009_078a_Delamere/
All data delivered, ready for archiving.
comment:26 Changed 14 years ago by knpa
- Description modified (diff)
- Owner changed from harg to knpa
- Status changed from new to assigned
Started archiving.
Project missing event file (and rcd logfiles).
Applanix has been processed and copied to asrf directory