#235 closed flight processing (fixed)
GB09/05, flight day 078c/2009, Leighton Leven Esthwaite
Reported by: | jatt | Owned by: | benj |
---|---|---|---|
Priority: | alpha 4 low | Milestone: | 2009 Data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by knpa)
Data location: ~arsf/arsf_data/in_progress/2009/flight_data/uk/GB09_05-2009_078c_Leighton_Leven_Esthwaite
Data arrived from ARSF via SATA disk N on 30th March 2009.
Scientific details: /users/rsg/arsf/arsf_data/2009/ARSF_Applications/GB09-05
Priority: a4L
PI: Dr Alan Blackburn
Sensors:
- Eagle (7/12/2009)
- Hawk (7/12/2009)
- ALS-II Lidar (05/10/2009)
- Photography (06/01/2010)
Quicklook
TBD.
Change History (36)
comment:1 Changed 16 years ago by jatt
- Owner mggr deleted
comment:2 Changed 16 years ago by jatt
- Milestone set to 2009 Data processing completion
- Priority changed from immediate to medium
comment:3 Changed 15 years ago by mggr
- Type changed from task to flight processing
comment:4 Changed 15 years ago by knpa
- Priority changed from alpha 4 high to alpha 4 low
comment:5 Changed 15 years ago by mggr
- Component changed from ARSF to Processing: general
comment:6 Changed 15 years ago by emca
- Owner set to emca
comment:7 Changed 15 years ago by emca
- Owner changed from emca to mark1
LIDAR processing now complete. Delivery directory created at
~airborne/workspace/GB09_05-2009_078c_Leighton_Leven_Esthwaite/leica/delivery
Passing to mark1 for delivery checking.
comment:8 Changed 15 years ago by mark1
- Owner changed from mark1 to emca
Delivery checked, opened ascii files in Grass and opened OK. Read-me needs accuracy vs vectors to be filled in. Otherwise good.
comment:9 Changed 15 years ago by emca
LIDAR data sent to PI 05/10/09.
comment:10 Changed 15 years ago by mggr
Re: #281 (Hawk frame rates are double what they should be), the following lines are affected and the .hdr file will need to be edited to halve the fps number:
uk/GB09_05-2009_078c_Leighton_Leven_Esthwaite/hawk/SWIR078c-09a-1.hdr: predicted length half recorded length, frame rate doubling problem?
comment:11 Changed 15 years ago by mark1
- Owner changed from emca to mark1
comment:12 Changed 15 years ago by mark1
Started processing of E/H hyperspectral. No nav file for any of the Eagle lines and data suffers from the variable boresight issue.
comment:13 Changed 15 years ago by mark1
renamed hawk SWIRdatacube.* to SWIR078c-09-1.* although the raw file only contains 4K of data.
comment:14 Changed 15 years ago by mark1
Hawk line 1 contains no data, Hawk line 7 has no .hdr file and the raw data appears to be corrupt. Hawk lines 6 and 8 have incorrect number of lines in .hdr files and no dark frames, indicating that hawk probably crashed during capture. Also hawk line 4 has no dark frames. Hawk lines 4 and 6 have been processed using the dark frames from line 3 while hawk line 8 has been processed using dark frames from line 9. This will result in approximate values, not a true radiometric calibration. Both Hawk and Eagle line 9 are very short.
comment:15 Changed 15 years ago by mark1
Eagle Line | GPT | SCT | Hawk Line | GPT | SCT |
1 | 0 | 1.6 | 1 | - | - |
2 | -0.1 | 0.8 | 2 | 0 | 0 |
3 | -0.15 | 0 | 3 | 0 | 0 |
4 | -0.34 | 0 | 4 | 0 | 0 |
5 | -0.06 | 0.8 | 5 | 0 | 0 |
6 | -0.35 | 1.3 | 6 | 0 | 0 |
7 | -0.20 | 0.8 | 7 | - | - |
8 | 0.02 | 0.7 | 8 | 0 | 0 |
9 | 0 | 0.7 | 9 | 0 | 0 |
comment:16 Changed 15 years ago by mark1
Boresight values
Eagle line | P | R | H | Hawk Line | P | R | H |
1 | -0.30 | -0.73 | 0 | 1 | - | - | - |
2 | -0.05 | -0.69 | 0.50 | 2 | -0.16 | 0.20 | 0.13 |
3 | 0.05 | -0.54 | -0.17 | 3 | -0.31 | 0.14 | 0.15 |
4 | 0.75 | -0.70 | 0.15 | 4 | -0.23 | 0.20 | 0 |
5 | -0.12 | -0.47 | 0.1 | 5 | -0.21 | 0.28 | -0.06 |
6 | 0.78 | -0.70 | -0.21 | 6 | -0.12 | 0.23 | 0 |
7 | 0.32 | -0.50 | 0.16 | 7 | - | - | - |
8 | -0.40 | -0.70 | -0.05 | 8 | -0.21 | 0.20 | 0 |
9 | -0.10 | -0.25 | 0 | 9 | -0.16 | 0.48 | 0.15 |
comment:17 Changed 15 years ago by mark1
Eagle/Hawk ready for delivery checking. Delivery directory located at:
~mark1/scratch_space/2009_data/GB09_05-2009_078c_Leighton_Leven_Esthwaite/delivery
comment:18 Changed 15 years ago by mark1
- Owner changed from mark1 to emca
- Status changed from new to assigned
comment:19 Changed 15 years ago by emca
Delivery check is complete. Minor changes to be made to read_me (flight line numbers and comment re: missing data in lev1 files).
comment:20 Changed 15 years ago by mark1
- Owner changed from emca to mark1
comment:21 Changed 15 years ago by mark1
Edited logsheet flight line numbers
comment:22 Changed 15 years ago by mark1
Delivery and run scripts have been rsynced to
~arsf/arsf_data/2009/flight_data/uk/GB09_05-2009_078c_Leighton_Leven_Esthwaite/
comment:23 Changed 15 years ago by mark1
- Description modified (diff)
Eagle and Hawk data dispatched to PI 7th December 2009
comment:24 Changed 15 years ago by mark1
Digital Photography data dispatched to PI on 6th January 2010
comment:25 Changed 15 years ago by mark1
- Description modified (diff)
comment:26 Changed 15 years ago by mark1
Lidar and Photography deliverys rsynced over to main arsf repo:
~arsf/arsf_data/2009/flight_data/uk/GB09_05-2009_078c_Leighton_Leven_Esthwaite/
comment:27 Changed 15 years ago by mark1
- Owner changed from mark1 to benj
Everything delivered to PI.
Ready for archiving.
comment:28 Changed 15 years ago by knpa
- Component changed from Processing: general to Archiving
- Description modified (diff)
- Resolution set to fixed
- Status changed from assigned to closed
Archived by DTG (12/01/09)
Preparing for NEODC.
comment:29 Changed 15 years ago by knpa
Tarball created and NEODC informed ready for transfer.
comment:30 Changed 15 years ago by knpa
NEODC have completed transfer.
Was missing dem but have found made available to them.
comment:31 Changed 11 years ago by tipo
Raw files for Hawk 6 and 7 were larger than indicated by the header files. Created copies trimmed to the correct size so that they could be processed.
comment:32 Changed 11 years ago by benj
Tim, see previous comment from Mark on various aspects of Hawk data corruption. Please consider the appropriate way to handle these - truncating the file may not be the appropriate option, you might be better to correct the header file if we can get more data that way.
comment:33 Changed 11 years ago by tipo
The difference in file size is by only part of a line, so I don't think it will be possible to match the sizes by altering the header. The partial line could be padded out with "empty" data to make it a full line, but that seems even less ideal a solution than just removing the partial line.
line 9 seems to be off by a complete line though, so I'll try altering the header of that one.
comment:34 Changed 11 years ago by benj
No, I agree - if there isn't a full line then we have to assume the partial one is corrupt, so truncating is the best option in this instance. Still might want to discuss the other lines above with Mark.
comment:35 Changed 8 years ago by lah
Archiving
Tidied and ready for upload to NEODC.
comment:36 Changed 8 years ago by asm
Archiving
Reprocessed hyperspectral has been archived and it is available from CEDA at browse.ceda.ac.uk/browse/neodc/arsf/2009/GB09_05/GB09_05-2009_078c_Leighton_Leven_Esthwaite/hyperspectral-reprocessed
Plymouth 11th May 2017
Started lidar processing