Opened 15 years ago

Last modified 8 years ago

#247 closed flight processing

HY05/02, flight day 153/2009, Ayrshire Coalfields — at Version 26

Reported by: jatt Owned by: knpa
Priority: alpha 4 medium Milestone: 2009 Data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by mark1)

Data location: ~arsf/arsf_data/2009/flight_data/uk/HY05_02-2009_153_Ayrshire_coalfields

Data arrived from ARSF via SATA disk M on 9th June 2009.

Scientific objective: N/K

Priority: α4M

PI: C Fleming

Sensors:

  • Eagle
  • Hawk
  • Leica LIDAR
  • Photography (15/01/2010)

Change History (27)

comment:1 Changed 15 years ago by knpa

  • Owner set to knpa
  • Status changed from new to assigned

comment:2 Changed 15 years ago by knpa

There were three separate sorties on the flight day, each with a different logsheet. Am dividing the file structure (on just my scratch space for now) into 3 trees, one for each site.

comment:3 Changed 15 years ago by knpa

Applanix processing completed

comment:4 Changed 15 years ago by knpa

Both E+H appear to have SCT offsets which need to be corrected by hand for every flightline.

comment:5 Changed 15 years ago by knpa

Line 9 has an uncorrectable along track shift along it's south edge. Cause unknown.

comment:6 Changed 15 years ago by knpa

Line 1 has a stretch along it's interior, the line fell off the DEM to the north, am extending DEM.

comment:7 Changed 15 years ago by knpa

Extended DEM to the north with panels ns63 and ns73 and have eliminated stretch from Line 1.

comment:8 Changed 15 years ago by knpa

All Hawk flightlines have a regular drop of scan lines resulting in approx. 7 across-track black lines 10 pixels wide.

comment:9 Changed 15 years ago by knpa

Line 5 was causing azimport to seg fault. Error was determined to be caused by an incorrect value for the number of scan lines in the header file (given as 10). This has been changed to the correct number calculated from the size of the raw file (result = 7283 scan lines).

comment:10 Changed 15 years ago by knpa

#note# Above message is referring to Hawk Line 5.

comment:11 Changed 15 years ago by knpa

Eagle Line 14 - No Sync information - needs to be corrected manually

comment:12 Changed 15 years ago by mggr

Mail from Dr Ferrier:

My name is Dr graham ferrier, i am co-PI on HY05-02. Unfortunately i
wasn't able to be on the ground at the time of the overflight. I am
therefore trying to get up to the site relatively soon to take some
field spectral measurements of calibration targets. Would you have any
quicklook photographs of the dataset to enable me to target my field
campaign.

Kevin has been working on this so will collect some overview images.

comment:13 Changed 15 years ago by knpa

.png overview shots sent to PI

comment:14 Changed 15 years ago by knpa

SCT offsets for all flightlines for the three sites found (~/backup/sctHY05_02).

Awaiting arrival of Vectors before we can proceed to delivery checking.

comment:15 Changed 15 years ago by knpa

e-mailed PI to enquire whether or not they want to wait for vectors

comment:16 Changed 15 years ago by knpa

PI replied they are happy to wait for delivery upon final check.

Changed 15 years ago by knpa

comment:17 Changed 15 years ago by mark1

Vectors have arrived.

comment:18 Changed 15 years ago by knpa

Awaiting delivery check

comment:19 Changed 15 years ago by emca

  • Owner changed from knpa to emca
  • Status changed from assigned to new

comment:20 Changed 15 years ago by emca

Delivery checking complete.
Changes made to read_me and file names.
Ready to deliver.

comment:21 Changed 15 years ago by knpa

  • Owner changed from emca to knpa

comment:22 Changed 15 years ago by knpa

HYPERSPECTRAL DELIVERED TODAY

comment:23 Changed 15 years ago by knpa

  • Owner knpa deleted

comment:24 Changed 15 years ago by knpa

  • Owner set to knpa
  • Status changed from new to assigned

comment:25 Changed 15 years ago by mark1

  • Description modified (diff)

comment:26 Changed 15 years ago by mark1

  • Description modified (diff)

Digital Photography dispatched to PI on 15 January 2010

Note: See TracTickets for help on using tickets.