Opened 15 years ago

Last modified 7 years ago

#261 closed flight processing

IPY09/11, flight day 215/2009, Helheim — at Version 10

Reported by: knpa Owned by: benj
Priority: alpha 4 high Milestone: 2009 Data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by mark1)

Data location: ~arsf/arsf_data/2009/flight_data/ipy/IPY09_11-2009_215_Helheim

Data arrived from ARSF via SATA disk Daphne03 on 24/08/09.

Scientific objective: Ice thickness measurements to add to a record of two major glaciers and to create a high res DEM.

Alpha 4-High

PI: T. Murray

Sensors:

  • Eagle
  • Hawk
  • Leica LIDAR
  • Digital Photographs (11/02/2010)

Change History (10)

comment:1 Changed 15 years ago by knpa

  • Priority changed from alpha 4 medium to alpha 4 high

comment:2 Changed 15 years ago by knpa

  • Description modified (diff)

comment:3 Changed 15 years ago by knpa

Corrected logsheet project code from GB09_21

comment:4 Changed 14 years ago by benj

  • Owner set to benj
  • Status changed from new to assigned

comment:5 Changed 14 years ago by benj

We've got Lidar data for three flightlines but IPAS for only the first two. Logsheet only has two lines recorded (and an IPAS problem mentioned) so presumably the third line was aborted and re-flown on one of the other days (218 or 219).

comment:6 Changed 14 years ago by benj

Turns out the first two lidar lines we have are test lines. Have downloaded the remaining three lines from Thelma (of which I think the last two are test lines again.

Also, the IPAS problem was because of a break in the data. We actually do have IPAS data for the whole flight.

comment:7 Changed 14 years ago by benj

The two lidar lines do appear to have an offset between them (order ~50cm in places, though it's hard to pin down). Unfortunately they only have a very small overlap region and that's at an angle (over a glacier, which obviously is neither flat nor smooth), which means I can't tell which of the potential error sources is causing it.

comment:8 Changed 14 years ago by mark1

Photography data tagged using log file since keep getting error that IPAS data does not overlap with photo time stamps.

comment:9 Changed 14 years ago by mark1

Photography delivery checked and ready to deliver.

comment:10 Changed 14 years ago by mark1

  • Description modified (diff)

Photographs dispatched to PI on 11/02/2010