Opened 15 years ago
Last modified 8 years ago
#261 closed flight processing
IPY09/11, flight day 215/2009, Helheim — at Version 17
Reported by: | knpa | Owned by: | emca |
---|---|---|---|
Priority: | alpha 4 high | Milestone: | 2009 Data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by mark1)
Data location: ~arsf/arsf_data/2009/flight_data/ipy/IPY09_11-2009_215_Helheim
Data arrived from ARSF via SATA disk Daphne03 on 24/08/09.
Scientific objective: Ice thickness measurements to add to a record of two major glaciers and to create a high res DEM.
Alpha 4-High
PI: T. Murray
Sensors:
- Eagle (08/04/2010)
- Hawk (08/04/2010)
- Leica LIDAR (08/04/2010)
- Digital Photographs (11/02/2010)
Change History (17)
comment:1 Changed 15 years ago by knpa
- Priority changed from alpha 4 medium to alpha 4 high
comment:2 Changed 15 years ago by knpa
- Description modified (diff)
comment:3 Changed 15 years ago by knpa
comment:4 Changed 15 years ago by benj
- Owner set to benj
- Status changed from new to assigned
comment:5 Changed 15 years ago by benj
We've got Lidar data for three flightlines but IPAS for only the first two. Logsheet only has two lines recorded (and an IPAS problem mentioned) so presumably the third line was aborted and re-flown on one of the other days (218 or 219).
comment:6 Changed 15 years ago by benj
Turns out the first two lidar lines we have are test lines. Have downloaded the remaining three lines from Thelma (of which I think the last two are test lines again.
Also, the IPAS problem was because of a break in the data. We actually do have IPAS data for the whole flight.
comment:7 Changed 15 years ago by benj
The two lidar lines do appear to have an offset between them (order ~50cm in places, though it's hard to pin down). Unfortunately they only have a very small overlap region and that's at an angle (over a glacier, which obviously is neither flat nor smooth), which means I can't tell which of the potential error sources is causing it.
comment:8 Changed 15 years ago by mark1
Photography data tagged using log file since keep getting error that IPAS data does not overlap with photo time stamps.
comment:9 Changed 15 years ago by mark1
Photography delivery checked and ready to deliver.
comment:10 Changed 15 years ago by mark1
- Description modified (diff)
Photographs dispatched to PI on 11/02/2010
comment:11 Changed 15 years ago by benj
- Owner changed from benj to emca
comment:12 Changed 15 years ago by emca
LiDAR processing complete. Ready for delivery checking at
~airborne/workspace/IPY09_11-2009_215_Helheim/delivery/20100324/IPY09
comment:13 Changed 15 years ago by mark1
LIDAR delivery checked. All looks good. Ready to deliver.
comment:14 Changed 15 years ago by emca
Hyperspectral data ready for delivery checking at
~airborne/workspace/IPY09_11-2009_215_Helheim/delivery/20100407/IPY09_11
comment:15 Changed 15 years ago by mark1
Hyperspectral delivery checked, example commands tested and data looks good. Ready to deliver.
comment:16 Changed 15 years ago by emca
Line No. | SCT |
Eagle 1 | 0.04 |
Eagle 2 | -0.01 |
Hawk 1 | 0.00 |
Note: due to Hawk failure no data for Hawk line 2
comment:17 Changed 15 years ago by mark1
- Description modified (diff)
Lidar and Hyperspectral data dispatched to PI on 08/04/2010
Corrected logsheet project code from GB09_21