Opened 15 years ago
Last modified 8 years ago
#266 closed flight processing
GB08/08, flight day 268b/2009, Wytham woods — at Version 10
Reported by: | mark1 | Owned by: | emca |
---|---|---|---|
Priority: | alpha 4 high | Milestone: | 2009 Data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by mark1)
Data location: ~arsf/arsf_data/2009/flight_data/uk/GB08_08-2009_268b_Wytham_woods
Data arrived from ARSF via SATA disk L on 7th October 2009.
Scientific objective: see ~/arsf/arsf_data/in_progress/2008/ARSF_Applications/GB_and_NL/GB08-08 Science Case.pdf
Priority: alpha-4-High
PI: Richard Harding
Sensors:
- Eagle
- Hawk
- Leica LIDAR (25/03/2010)
Change History (10)
comment:1 Changed 15 years ago by mark1
comment:2 Changed 15 years ago by mark1
Eagle and Hawk files in wrong project.
Eagle and Hawk files have been moved to GB08_10-2009_268c_Denny_wood/. Eagle files from boresight_2009-268a_little_riss have moved into this project. Currently no Hawk files.
comment:3 Changed 15 years ago by mark1
- Milestone set to 2009 Data processing completion
comment:4 Changed 15 years ago by mark1
logsheet arrived and unpacked
comment:5 Changed 15 years ago by mggr
Hawk data recovered from aircraft disks, put in directory and renamed from Hawk268b-09-* to SWIR268b-09-*.
comment:6 Changed 15 years ago by mggr
Re: #281 (Hawk frame rates are double what they should be), the following lines are affected and the .hdr file will need to be edited to halve the fps number:
uk/GB08_08-2009_268b_Wytham_woods/hawk/SWIR268b-09-1.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_08-2009_268b_Wytham_woods/hawk/SWIR268b-09-2.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_08-2009_268b_Wytham_woods/hawk/SWIR268b-09-3.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_08-2009_268b_Wytham_woods/hawk/SWIR268b-09-4.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_08-2009_268b_Wytham_woods/hawk/SWIR268b-09-5.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_08-2009_268b_Wytham_woods/hawk/SWIR268b-09-6.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_08-2009_268b_Wytham_woods/hawk/SWIR268b-09-7.hdr: predicted length half recorded length, frame rate doubling problem?
comment:7 Changed 15 years ago by emca
- Owner set to emca
- Status changed from new to assigned
Starting LIDAR processing
comment:8 Changed 15 years ago by emca
LIDAR delivery directory created at
~airborne/workspace/GB08_08-2009_268b_Wytham_woods/delivery/20100322
Ready for delivery check.
Starting Hyperspectral processing
comment:9 Changed 15 years ago by mark1
LIDAR delivery checked. Data viewed in lag and looks good.
Ready to deliver.
comment:10 Changed 15 years ago by mark1
- Description modified (diff)
LIDAR dispatched to PI on 25/03/2010
Still awaiting flight logsheet.
Also, errors when generating DEM in Grass but it still output a DEM, check it is good when processing.
When logsheet arrives check eagle / hawk files and rename them - currently all named with 268c - need to check they are for 268b and not 268c.