Opened 15 years ago
Last modified 8 years ago
#267 closed flight processing
GB08/10, flight day 268c, Denny Wood — at Version 17
Reported by: | mark1 | Owned by: | emca |
---|---|---|---|
Priority: | alpha 4 high | Milestone: | 2009 Data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: | mark1 |
Description (last modified by emca)
Data location: ~arsf/arsf_data/2009/flight_data/uk/GB08_10-2009_268c_Denny_wood
Data arrived from ARSF via SATA disk L on the 7th October 2009
Scientific objective: see /users/rsg/arsf/arsf_data/2008/ARSF_Applications/GB_and_NL/GB08-10 Science Case.pdf
Priority: alpha-4-High
PI: Ross Hill
Sensors:
- Eagle (14/12/2009)
- Hawk (14/12/2009)
- Leica LIDAR (26/04/2010)
Change History (17)
comment:1 Changed 15 years ago by mark1
comment:2 Changed 15 years ago by mark1
Eagle and Hawk files in wrong project. Have moved the Eagle/Hawk files to boresight_2009-268a_little_riss.
Eagle/Hawk files from GB08_08-2009_268b_Wytham_woods have been moved into this project (during unpacking)
comment:3 Changed 15 years ago by mark1
Have renamed Eagle files 5-13 to have VNIR prefix
comment:4 Changed 15 years ago by mark1
- Milestone set to 2009 Data processing completion
comment:5 Changed 15 years ago by mark1
logsheet arrived and unpacked
comment:6 Changed 15 years ago by mark1
have renamed hawk files from 268* to SWIR268*
comment:7 Changed 15 years ago by mggr
Re: #281 (Hawk frame rates are double what they should be), the following lines are affected and the .hdr file will need to be edited to halve the fps number:
uk/GB08_10-2009_268c_Denny_wood/hawk/SWIR268c-09-1.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_10-2009_268c_Denny_wood/hawk/SWIR268c-09-2.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_10-2009_268c_Denny_wood/hawk/SWIR268c-09-3.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_10-2009_268c_Denny_wood/hawk/SWIR268c-09-4.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_10-2009_268c_Denny_wood/hawk/SWIR268c-09-5.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_10-2009_268c_Denny_wood/hawk/SWIR268c-09-6.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_10-2009_268c_Denny_wood/hawk/SWIR268c-09-7.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_10-2009_268c_Denny_wood/hawk/SWIR268c-09-8.hdr: predicted length half recorded length, frame rate doubling problem?
comment:8 Changed 15 years ago by emca
- Owner set to emca
comment:9 Changed 15 years ago by emca
Per flight line SCT values for Eagle and Hawk
Flight line | Eagle | Hawk |
1 | - | 0.16 |
2 | - | 0.17 |
3 | - | 0.10 |
4 | 0.02 | 0.10 |
5 | 0.04 | 0.16 |
6 | -0.01 | 0.18 |
7 | 0.04 | 0.10 |
8 | 0.07 | 0.11 |
9 | 0.04 | - |
10 | 0.11 | - |
11 | 0.01 | - |
12 | 0.05 | - |
13 | 0.06 | - |
comment:10 Changed 15 years ago by emca
Eagle lines 1, 2 and 3 are very short and are not included in the delivery (2 and 3 do not appear on the log sheet). Eagle line 7 has an incorrect number of lines in the header file and no dark frames. This line was processed using the dark frames from Eagle line 8.
Project is ready for delivery checking and delivery directory has been created at
~airborne/workspace/GB08_10-2009_268c_Denny_wood/delivery
comment:12 Changed 15 years ago by mark1
Minor edits made to read me file, all data viewed and example commands tested (without dem). Data looks good.
Ready to deliver - data has not been rsynced back.
comment:13 Changed 15 years ago by emca
Eagle and Hawk data sent to PI 14/12/09
comment:14 Changed 15 years ago by emca
Starting LIDAR processing
comment:15 Changed 15 years ago by emca
LIDAR processing complete
Ready for delivery check at
~airborne/workspace/GB08_10-2009_268c_Denny_wood/delivery/20100422/GB08_10
comment:16 Changed 15 years ago by mark1
LIDAR delivery checked and all looks good.
Ready for delivery.
comment:17 Changed 15 years ago by emca
- Component changed from Processing: general to Archiving
- Description modified (diff)
LiDAR data dispatched to PI 26/04/2010
LiDAR and Hyperspectral rsync'd to
~arsf/arsf_data/2009/flight_data/uk/GB08_10-2009_268c_Denny_wood
Ready for archiving
Still awaiting flight logsheet.
DEM creation caused errors in Grass but still outputted a DEM. Check DEM is good when processing.