Opened 15 years ago
Last modified 8 years ago
#279 closed flight processing
GB09/05, flight day 278c, Leighton moss — at Version 16
Reported by: | mark1 | Owned by: | knpa |
---|---|---|---|
Priority: | alpha 4 low | Milestone: | 2009 Data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by knpa)
Data location: ~arsf/arsf_data/2009/flight_data/uk/GB09_05-2009_278c_Leighton_moss
Data arrived from ARSF via SATA disk LETTER L on 7th October 2009.
Scientific objective: /users/rsg/arsf/arsf_data/2009/ARSF_Applications/GB09-05.pdf
Priority: alpha-4-low
PI: A. Blackburn
Sensors:
- Eagle (09/03/10)
- Hawk (09/03/10)
- Leica LIDAR (28/04/10) (see ticket #270)
Change History (16)
comment:1 Changed 15 years ago by mark1
- Description modified (diff)
comment:2 Changed 15 years ago by mark1
- Description modified (diff)
comment:3 Changed 15 years ago by mggr
Re: #281 (Hawk frame rates are double what they should be), the following lines are affected and the .hdr file will need to be edited to halve the fps number:
uk/GB09_05-2009_278c_Leighton_moss/hawk/SWIR278c-09-1.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB09_05-2009_278c_Leighton_moss/hawk/SWIR278c-09-2.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB09_05-2009_278c_Leighton_moss/hawk/SWIR278c-09-3.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB09_05-2009_278c_Leighton_moss/hawk/SWIR278c-09-4.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB09_05-2009_278c_Leighton_moss/hawk/SWIR278c-09-5.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB09_05-2009_278c_Leighton_moss/hawk/SWIR278c-09-6.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB09_05-2009_278c_Leighton_moss/hawk/SWIR278c-09-7.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB09_05-2009_278c_Leighton_moss/hawk/SWIR278c-09-8.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB09_05-2009_278c_Leighton_moss/hawk/SWIR278c-09-9.hdr: predicted length half recorded length, frame rate doubling problem?
comment:4 Changed 15 years ago by chrfi
- Owner set to chrfi
- Status changed from new to accepted
comment:5 Changed 15 years ago by chrfi
awaiting vectors
comment:6 Changed 15 years ago by chrfi
users dosen't want to wait for vectors.
sct offsets,
flightline | eagle | hawk |
1 | 0.02 | 0.88 |
2 | -0.07 | 0.60 |
3 | 0.00 | 0.60 |
4 | 0.00 | 0.15 |
5 | 0.00 | 0.52 |
6 | 0.06 | 0.55 |
7 | 0.00 | 0.47 |
8 | 0.04 | 0.52 |
9 | -0.04 | 0.23 |
comment:7 Changed 15 years ago by mark1
vectors arrived 02/03/2010
comment:8 Changed 15 years ago by mark1
Delivery checked Hyperspectral delivery. Viewed all data and tested example commands, looks good. Few edits made to read_me file. Need to change flight line numbers - then ready to deliver.
comment:9 Changed 15 years ago by chrfi
eagle and hawk data dispatched, email sent, hard drive table updated
comment:10 Changed 15 years ago by chrfi
forgot to mention, dispatched 9th March
comment:11 Changed 15 years ago by mark1
LIDAR delivery has been checked. Minor corrections made to read me and filenames. Needs comparison to vectors and probably best to split the DEM and screenshots into 2 separate ones rather than one big one.
comment:12 Changed 15 years ago by chrfi
lidar roll offsets
154230 | -0.403 |
154612 | -0.0393 |
155020 | -0.00390 |
155413 | -0.00393 |
155802 | -0.00373 |
160344 | -0.00344 |
160717 | -0.00333 |
161214 | -0.00359 |
161543 | -0.00354 |
comment:13 Changed 15 years ago by chrfi
lidar dispatched 28/04/2010
comment:14 Changed 15 years ago by chrfi
- Resolution set to fixed
- Status changed from accepted to closed
comment:15 Changed 15 years ago by chrfi
- Resolution fixed deleted
- Status changed from closed to reopened
my mistake, still needs rsyncing and archiving.
waiting for space on bowhead
comment:16 Changed 14 years ago by knpa
- Description modified (diff)
- Owner changed from chrfi to knpa
- Status changed from reopened to assigned
Begun archiving.
This project has been split from GB09/05 278b (ticket #270) and contains duplicates of the applanix and rinex data but separate Eagle/Hawk and logsheets. The Leica Lidar data has remained in GB09/05 278b since its difficult to tell where it should be split or which project areas it relates to.