Opened 15 years ago
Last modified 9 years ago
#322 closed flight processing
GB09/04, flight day 062/2010, Coed-y-Brenin — at Version 23
Reported by: | benj | Owned by: | |
---|---|---|---|
Priority: | alpha 4 low | Milestone: | 2010 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | iopa@… | Other processors: | iopa |
Description (last modified by iopa)
Data location: ~arsf/arsf_data/2010/flight_data/uk/GB09_04-2010_062_Coed_Y_Brenin
Data arrived from ARSF via network transfer on 19th March 2010.
Scientific objective: Mapping Rhododendron sites using combination hyperspectral and LiDAR.
Priority: a4l
PI: Sarah Taylor
Sensors:
- Eagle (03/09/2010)
- Hawk
- Leica LIDAR (03/09/2010)
- RCD Digital Photography (03/09/2010)
Change History (23)
comment:1 Changed 15 years ago by benj
comment:2 Changed 15 years ago by benj
- Milestone set to 2010 data processing completion
comment:3 Changed 15 years ago by mggr
When the photos are processed, please let Mike know - Bill is interested in copies of high-relief photos purely for internal testing purposes.
comment:4 Changed 14 years ago by pmlvis10
IPAS navigation for this project has been processed.
comment:5 Changed 14 years ago by ella
Looks like applanix navigation processing has been done. Copied to arsf workspace in Samba.
comment:6 Changed 14 years ago by iopa
- Cc iopa@… added
- Other processors set to iopa
Processing Hyperspectral.
comment:7 Changed 14 years ago by iopa
Hyperspectral data has been processed. PI will now be contacted to determine whether OS vector verification is required.
comment:8 Changed 14 years ago by iopa
Regarding my message above, no contact with PI is required since we already have the vectors.
comment:9 Changed 14 years ago by iopa
Eagle/Hawk SCT Offsets attached. Hawk ones have been significantly over the 0.1 positive limit in this project and above 1 second. There were also two peaks of 28.75 and 43.3 seconds.
comment:10 Changed 14 years ago by jb362
Starting delivery check
comment:11 Changed 14 years ago by jb362
Hyperspectral delivery check complete. Everything fine, although worth noting:
1) Only 60 bands for eagle data although this is because of 8,1 binning as shown in eagle header file.
2) Pixel overflow for eagle flight lines:
e2: bands 0-14
e10: bands 0-25
e11: bands 0-29
e12: bands 0-24
e13: bands 0-16
e20: bands 0-23
e22: bands 0-32
3) Hawk band 160 blank for all flight lines
comment:12 Changed 14 years ago by jb362
4) Also, you need to put the DEM in the delivery directory
comment:13 Changed 14 years ago by iopa
Hyperspectral is ready to deliver.
comment:14 Changed 14 years ago by iopa
Taking up LiDAR.
comment:16 Changed 14 years ago by jb362
Delivery checking camera.
comment:17 Changed 14 years ago by jb362
Camera delivery looks fine.
comment:18 Changed 14 years ago by iopa
LiDAR processing complete and ready for checking.
comment:19 Changed 14 years ago by ella
Starting LiDAR checking.
comment:20 Changed 14 years ago by ella
Aborting delivery check.
comment:21 Changed 14 years ago by iopa
Roll offset used for LiDAR processing: 0.00089950 (rad)
comment:22 Changed 14 years ago by emca
Delivery checked LiDAR delivery at
~airborne/workspace/GB09_04-2010_062_Coed_Y_Brenin/delivery/20100901/GB09_04
Need to update logsheet to typed version and ensure the name is in the correct format. Also Julian day on the logsheet says 063 - should this be changed to 062?
Remove hidden files from delivery directory (.nfs*)
comment:23 Changed 14 years ago by iopa
- Description modified (diff)
Dispatched USB Disk on 03/09/2010 containing Eagle, LiDAR and Photography data.
There are 24 eagle and hawk lines but only 22 recorded on the logsheet, presumably two were re-flown. Have asked ARSF-ops which two are affected (though looking at file sizes I think the bad ones are probably 1 and 13 for Eagle and 1 and 2 for Hawk).