Opened 15 years ago

Last modified 9 years ago

#322 closed flight processing

GB09/04, flight day 062/2010, Coed-y-Brenin — at Version 23

Reported by: benj Owned by:
Priority: alpha 4 low Milestone: 2010 data processing completion
Component: Archiving Keywords:
Cc: iopa@… Other processors: iopa

Description (last modified by iopa)

Data location: ~arsf/arsf_data/2010/flight_data/uk/GB09_04-2010_062_Coed_Y_Brenin

Data arrived from ARSF via network transfer on 19th March 2010.

Scientific objective: Mapping Rhododendron sites using combination hyperspectral and LiDAR.

Priority: a4l

PI: Sarah Taylor

Sensors:

  • Eagle (03/09/2010)
  • Hawk
  • Leica LIDAR (03/09/2010)
  • RCD Digital Photography (03/09/2010)

Change History (23)

comment:1 Changed 15 years ago by benj

There are 24 eagle and hawk lines but only 22 recorded on the logsheet, presumably two were re-flown. Have asked ARSF-ops which two are affected (though looking at file sizes I think the bad ones are probably 1 and 13 for Eagle and 1 and 2 for Hawk).

comment:2 Changed 15 years ago by benj

  • Milestone set to 2010 data processing completion

comment:3 Changed 15 years ago by mggr

When the photos are processed, please let Mike know - Bill is interested in copies of high-relief photos purely for internal testing purposes.

comment:4 Changed 14 years ago by pmlvis10

IPAS navigation for this project has been processed.

comment:5 Changed 14 years ago by ella

Looks like applanix navigation processing has been done. Copied to arsf workspace in Samba.

comment:6 Changed 14 years ago by iopa

  • Cc iopa@… added
  • Other processors set to iopa

Processing Hyperspectral.

comment:7 Changed 14 years ago by iopa

Hyperspectral data has been processed. PI will now be contacted to determine whether OS vector verification is required.

comment:8 Changed 14 years ago by iopa

Regarding my message above, no contact with PI is required since we already have the vectors.

comment:9 Changed 14 years ago by iopa

Eagle/Hawk SCT Offsets attached. Hawk ones have been significantly over the 0.1 positive limit in this project and above 1 second. There were also two peaks of 28.75 and 43.3 seconds.

comment:10 Changed 14 years ago by jb362

Starting delivery check

comment:11 Changed 14 years ago by jb362

Hyperspectral delivery check complete. Everything fine, although worth noting:

1) Only 60 bands for eagle data although this is because of 8,1 binning as shown in eagle header file.

2) Pixel overflow for eagle flight lines:

e2: bands 0-14
e10: bands 0-25
e11: bands 0-29
e12: bands 0-24
e13: bands 0-16
e20: bands 0-23
e22: bands 0-32

3) Hawk band 160 blank for all flight lines

comment:12 Changed 14 years ago by jb362

4) Also, you need to put the DEM in the delivery directory

comment:13 Changed 14 years ago by iopa

Hyperspectral is ready to deliver.

comment:14 Changed 14 years ago by iopa

Taking up LiDAR.

comment:15 Changed 14 years ago by iopa

  • Description modified (diff)

Taking camera processing.

comment:16 Changed 14 years ago by jb362

Delivery checking camera.

comment:17 Changed 14 years ago by jb362

Camera delivery looks fine.

comment:18 Changed 14 years ago by iopa

LiDAR processing complete and ready for checking.

comment:19 Changed 14 years ago by ella

Starting LiDAR checking.

comment:20 Changed 14 years ago by ella

Aborting delivery check.

comment:21 Changed 14 years ago by iopa

Roll offset used for LiDAR processing: 0.00089950 (rad)

comment:22 Changed 14 years ago by emca

Delivery checked LiDAR delivery at
~airborne/workspace/GB09_04-2010_062_Coed_Y_Brenin/delivery/20100901/GB09_04

Need to update logsheet to typed version and ensure the name is in the correct format. Also Julian day on the logsheet says 063 - should this be changed to 062?

Remove hidden files from delivery directory (.nfs*)


comment:23 Changed 14 years ago by iopa

  • Description modified (diff)

Dispatched USB Disk on 03/09/2010 containing Eagle, LiDAR and Photography data.

Note: See TracTickets for help on using tickets.