Opened 15 years ago
Last modified 9 years ago
#330 closed flight processing
FW10/01, flight day 98/2010, New_Forest — at Version 23
Reported by: | benj | Owned by: | mark1 |
---|---|---|---|
Priority: | alpha 4 medium | Milestone: | 2010 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by mark1)
Data location: ~arsf/arsf_data/2010/flight_data/uk/FW10_01-2010_098_New_Forest
Data arrived from ARSF via network transfer on 12th April 2010.
Scientific objective: Test flight for full-waveform LiDAR
Priority: a4m (not graded by SC, assigned following consultation with ppu)
PI: Ross Hill
Full waveform test flight. Will be delivered to PI but not specifically requested.
Sensors:
- Eagle (18/08/2010)
- Hawk (13/12/2010)
- Leica LIDAR (Full Waveform) (11/08/2010)
- RCD (11/08/2010)
Change History (23)
comment:1 Changed 15 years ago by mggr
comment:2 Changed 15 years ago by mggr
- Summary changed from FW10_01, flight day 98/2010, Full waveform test to FW10/01, flight day 98/2010, Full waveform test
Fix summary line (in case we ever automate this).
comment:3 Changed 15 years ago by mark1
IPAS has been processed but due to large distance (~80km) to nearest available base station results are not great.
comment:4 Changed 15 years ago by mark1
applanix data also processed
comment:5 Changed 15 years ago by mark1
started hyperspectral processing
comment:6 Changed 15 years ago by mark1
- Description modified (diff)
- Summary changed from FW10/01, flight day 98/2010, Full waveform test to FW10/01, flight day 98/2010, New_Forest
comment:7 Changed 15 years ago by mark1
- Owner set to mark1
- Status changed from new to accepted
comment:8 Changed 15 years ago by mark1
Eagle file -6 has 3937 lines, not 1837 as reported in hdr file. Have edited hdr file appropriately.
comment:9 Changed 14 years ago by mark1
Removed photographs 1-16 since they do not overlap the flight lines
comment:10 Changed 14 years ago by mark1
Photograph delivery has been checked and looks ok.
comment:11 Changed 14 years ago by mark1
Hyperspectral delivery is ready for checking at:
/users/rsg/airborne/workspace/FW10_01-2010_098_New_Forest/delivery/20100524/FW10_01/
Lidar delivery is ready for checking (but needs an updated quality report) at:
/users/rsg/airborne/workspace/FW10_01-2010_098_New_Forest/delivery/20100525/FW10_01/
comment:12 Changed 14 years ago by mark1
Eagle and Hawk SCTs
Eagle Raw line | SCT | Hawk Raw Line | SCT |
-2 | 0.02 | -2 | -0.02 |
-3 | 0.04 | -3 | 0.02 |
-4 | -0.02 | -4 | -0.02 |
-5 | 0.03 | -5 | 0.06 |
-6 | -0.02 | -6 | 0.01 |
-7 | 0.02 | -7 | 0.01 |
-8 | 0.0 | -8 | 0.03 |
-9 | 0.04 | -9 | 0.01 |
-10 | -0.04 | -10 | 0.02 |
-11 | 0.02 | -11 | 0.06 |
-12 | 0.0 | -12 | 0.0 |
-13 | 0.0 | -13 | 0.0 |
-14 | 0.0 | -14 | -0.01 |
-15 | 0.02 | -15 | 0.02 |
-16 | -0.02 | -16 | -0.01 |
-17 | 0.02 | -17 | 0.06 |
-18 | -0.02 | -18 | 0.02 |
-19 | 0.02 | -19 | 0.01 |
-20 | 0.0 | -20 | 0.0 |
-21 | 0.0 | -21 | 0.01 |
-22 | 0.0 | -22 | -0.02 |
-23 | 0.0 | -23 | 0.01 |
-24 | -0.02 | -24 | -0.02 |
-25 | 0.03 | -25 | 0.02 |
-26 | -0.04 | -26 | -0.02 |
-27 | 0.02 | -27 | 0.0 |
comment:13 Changed 14 years ago by chrfi
delivery checked: all hawk lines, band 160 are value zero
no other issues
comment:14 Changed 14 years ago by mggr
For the full waveform delivery, please include ASCII + LAS1.0 versions of the discrete returns as well as LAS1.3 FW data. Also, we need to include the data sampling rate (possibly per line) in the documentation, e.g. 256 samples @ 1ns?
comment:15 Changed 14 years ago by emca
LIDAR data delivery checked.
Made some changes to the Readme and to the filenames to conform to the standard.
Checked several FW LAS files in TScan and all load okay with the .trj file.
Ready to deliver.
comment:16 Changed 14 years ago by mark1
- Description modified (diff)
LiDAR and Photography data delivered to PI on 11/08/2010.
comment:17 Changed 14 years ago by mark1
PI requested that we send Eagle data separately now rather than wait for the Hawk calibration issue to be resolved.
comment:18 Changed 14 years ago by mark1
- Description modified (diff)
Eagle data dispatched to PI 18/08/2010.
comment:19 Changed 14 years ago by mark1
There was no rinex/basestation data so used download option from grafnav when processing the trajectory data.
comment:20 Changed 14 years ago by mark1
Rsynced LiDAR/Camera/Eagle over to ~arsf. Did not rsync proc_laser since las files were delivered to PI in the LiDAR delivery.
comment:21 Changed 14 years ago by emca
Corrected LAS1.3 files sent to R Hill 21/10/2010
(incorrect header on original delivered files due to an error in processing software)
comment:22 Changed 14 years ago by anch
Delivery checked hawk - everything is fine and ready to deliver.
comment:23 Changed 14 years ago by mark1
- Description modified (diff)
Hawk data has been dispatched to PI, as well as FW LiDAR extractions from the new extracting tool.
Please notify Dr Hill when processing begins, as he and his student may wish to visit (once the data is confirmed to be basically ok).