Opened 14 years ago
Last modified 6 years ago
#373 closed flight processing
EU10/03 & EUFAR10/01 (AIMWETLAB), flight day 238c/2010, Kis Balaton — at Version 31
Reported by: | iopa | Owned by: | emca |
---|---|---|---|
Priority: | alpha 5 | Milestone: | 2010 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by emca)
Data location: ~arsf/workspace/EU10_03-2010_238c_Kis_Balaton
Data arrived from ARSF via SATA disk Q on 15/09/2010.
However missing IPAS and LiDAR data on disk Q and on thelma delayed unpacking until 06/10/2010.
Scientific objective: Lake Balaton provides an ideal area for testing emerging algorithms on retrieval of in-water constituents and on mapping bloom-forming cyanobacteria using in-situ radiometric, airborne and satellite data.
Priority: a5 - the data set as a whole is listed as a5 due to it being part of EU10/03, however the PI of EU10/03 has lowered the LiDAR priority to a4m, and therefore LiDAR stands with a priority of a4h due to being part of EUFAR10/01.
PI: A. Tyler (EU10/03) & A. Zlinszky (EUFAR10/01)
When data is processed it should be dispatched to both PIs individually for their respective projects.
This data needed to be split into 238c and 238d, there was already a logsheet for each distinct set of data. The reason they needed splitting was that the first set of data (238c) is part of 2 projects (EU10-03), whereas the second (238d) only of 1 (EUFAR10-01). Originally they were both came from ARSF Ops as 238c.
Note: Data is currently symlinked from ~arsf/arsf_data/2010/flight_data/archive_overflow and when this is resolved the symlinks will need to be re-directed.
Sensors:
- Eagle (27/10/2010 & 28/10/2010)
- Hawk (28/01/2011)
- Leica LIDAR (19/04/2011)
- Digital Photography (27/10/2010 & 28/10/2010)
Change History (32)
comment:1 Changed 14 years ago by iopa
- Description modified (diff)
comment:2 Changed 14 years ago by iopa
comment:3 Changed 14 years ago by iopa
- Description modified (diff)
comment:4 Changed 14 years ago by iopa
- Description modified (diff)
comment:5 Changed 14 years ago by iopa
Taking camera.
comment:6 Changed 14 years ago by iopa
Applanix and IPAS for this project have been done, they also cover 238d fully.
Taking eagle.
comment:7 Changed 14 years ago by iopa
Hawk header file 4 was missing GPS Start/End position so they were filled in with the matching GPS time record from the sbet file.
comment:8 Changed 14 years ago by iopa
Original Eagle header file 4 (backed up in the workspace as VNIR238c-10-4.hdr_real) contained the wrong number of lines. The correct number was entered after opening the .raw with fastQC and the line processes successfully.
comment:9 Changed 14 years ago by iopa
Camera ready for checking.
Changed 14 years ago by iopa
comment:10 Changed 14 years ago by iopa
Eagle ready for checking.
comment:11 Changed 14 years ago by iopa
Note;
for the camera delivery, apart from the files copied and renamed into .../delivery/20101021-Camera/EUFAR10_01 (which are eventfile,kml file,readme) when the data is copied onto disk for EUFAR10_01 the photographs and thumbnails will need to be renamed for their project code.
for the eagle delivery, all files that are different are already included in .../delivery/20101021-Eagle/EUFAR10_01
comment:12 Changed 14 years ago by knpa
Appears to be an issue with the bandset labels in the header files; they start at 900nm which is lower than it should be. Possibly incorrect bandset selected or none specified. Will leave this until end of the year and new Hawk calibration.
comment:13 Changed 14 years ago by emca
Camera delivery check complete. No issues.
~/airborne/workspace/EU10_03-2010_238c_Lake_Balaton_Peninsula/delivery/20101020/EU10_03
Ready for delivery
comment:14 Changed 14 years ago by emca
Delivery checked Eagle data.
~airborne/workspace/EU10_03-2010_238c_Lake_Balaton_Peninsula/delivery/20101021/EU10_03
Made some small changed to Readme. Ready to deliver.
comment:15 Changed 14 years ago by emca
- Description modified (diff)
Eagle and Camera data dispatched to PI 27/10/2010
comment:16 Changed 14 years ago by emca
Note above delivery relates to A Tyler. This data also needs to be sent to A Zlinszky.
comment:17 Changed 14 years ago by iopa
- Description modified (diff)
Dispatched Eagle and Camera to Dr. Zlinszky on 28/10/2010.
comment:18 Changed 14 years ago by anch
Starting Hawk processing
comment:19 Changed 14 years ago by anch
Submitted for delivery check
comment:20 Changed 14 years ago by emca
Delivery check the Hawk data at
~airborne/workspace/EU10_03-2010_238c_Lake_Balaton_Peninsula/delivery/20110110/
Data looks good.
Readme: mention Hawk regular dropped frames; typo in Quality and issues section "andi" should be "and"
Project name on logsheet does not match the Readme - which is correct?
Dem is symlinked - will this copy for the delivery? We are delivering the same DEM several times so can leave it out, with relevant changes to readme, but maybe should be included for archiving.
comment:21 Changed 14 years ago by anch
- Summary changed from EU10/03 & EUFAR10/01, flight day 238c/2010, Lake Balaton Peninsula to EU10/03 & EUFAR10/01, flight day 238c/2010, Kis Balaton
Indeed an incorrect name was used for the site name for the directory and ticket.
I have (Hopefully) fixed this now so the project site is now "Kis Balaton", not "Lake Balaton Peninsula".
Previously delivered Readme PDFs have been left as they were, but I will update my recent Hawk delivery to reflect the name change.
comment:22 Changed 14 years ago by anch
- Owner set to anch
- Status changed from new to assigned
comment:24 Changed 14 years ago by knpa
- Description modified (diff)
Updated description with new data location (taking into account project name change).
Also updated status spreadsheet with new name "Kis Balaton".
comment:25 Changed 14 years ago by emca
Starting LiDAR processing
comment:26 Changed 14 years ago by anch
LiDAR sent to PI at his request despite not being roll corrected or classified
comment:27 Changed 14 years ago by emca
LiDAR ready for delivery check at
~airborne/workspace/EU10_03-2010_238c_Kis_Balaton/delivery/20110318/
comment:28 Changed 14 years ago by anch
- Summary changed from EU10/03 & EUFAR10/01, flight day 238c/2010, Kis Balaton to EU10/03 & EUFAR10/01 (AIMWETLAB), flight day 238c/2010, Kis Balaton
comment:29 Changed 14 years ago by knpa
Taking LIDAR delivery check.
comment:30 Changed 14 years ago by knpa
- Owner changed from anch to emca
Delivery check finished, no problems found.
A copy of this delivery needs to be created for Dr Zlinszky also (Let me know when you've done this and I'll put it on my disk).
K
comment:31 Changed 14 years ago by emca
- Description modified (diff)
LiDAR data sent to A Tyler 19/04/2011
Applanix and IPAS is common with 238d and need only be processed once.