Opened 14 years ago

Last modified 6 years ago

#373 closed flight processing

EU10/03 & EUFAR10/01 (AIMWETLAB), flight day 238c/2010, Kis Balaton — at Version 31

Reported by: iopa Owned by: emca
Priority: alpha 5 Milestone: 2010 data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by emca)

Data location: ~arsf/workspace/EU10_03-2010_238c_Kis_Balaton

Data arrived from ARSF via SATA disk Q on 15/09/2010.
However missing IPAS and LiDAR data on disk Q and on thelma delayed unpacking until 06/10/2010.

Scientific objective: Lake Balaton provides an ideal area for testing emerging algorithms on retrieval of in-water constituents and on mapping bloom-forming cyanobacteria using in-situ radiometric, airborne and satellite data.

Priority: a5 - the data set as a whole is listed as a5 due to it being part of EU10/03, however the PI of EU10/03 has lowered the LiDAR priority to a4m, and therefore LiDAR stands with a priority of a4h due to being part of EUFAR10/01.

PI: A. Tyler (EU10/03) & A. Zlinszky (EUFAR10/01)

When data is processed it should be dispatched to both PIs individually for their respective projects.

This data needed to be split into 238c and 238d, there was already a logsheet for each distinct set of data. The reason they needed splitting was that the first set of data (238c) is part of 2 projects (EU10-03), whereas the second (238d) only of 1 (EUFAR10-01). Originally they were both came from ARSF Ops as 238c.

Note: Data is currently symlinked from ~arsf/arsf_data/2010/flight_data/archive_overflow and when this is resolved the symlinks will need to be re-directed.

Sensors:

  • Eagle (27/10/2010 & 28/10/2010)
  • Hawk (28/01/2011)
  • Leica LIDAR (19/04/2011)
  • Digital Photography (27/10/2010 & 28/10/2010)

Change History (32)

comment:1 Changed 14 years ago by iopa

  • Description modified (diff)

comment:2 Changed 14 years ago by iopa

Applanix and IPAS is common with 238d and need only be processed once.

comment:3 Changed 14 years ago by iopa

  • Description modified (diff)

comment:4 Changed 14 years ago by iopa

  • Description modified (diff)

comment:5 Changed 14 years ago by iopa

Taking camera.

comment:6 Changed 14 years ago by iopa

Applanix and IPAS for this project have been done, they also cover 238d fully.

Taking eagle.

comment:7 Changed 14 years ago by iopa

Hawk header file 4 was missing GPS Start/End position so they were filled in with the matching GPS time record from the sbet file.

comment:8 Changed 14 years ago by iopa

Original Eagle header file 4 (backed up in the workspace as VNIR238c-10-4.hdr_real) contained the wrong number of lines. The correct number was entered after opening the .raw with fastQC and the line processes successfully.

comment:9 Changed 14 years ago by iopa

Camera ready for checking.

Changed 14 years ago by iopa

comment:10 Changed 14 years ago by iopa

Eagle ready for checking.

comment:11 Changed 14 years ago by iopa

Note;

for the camera delivery, apart from the files copied and renamed into .../delivery/20101021-Camera/EUFAR10_01 (which are eventfile,kml file,readme) when the data is copied onto disk for EUFAR10_01 the photographs and thumbnails will need to be renamed for their project code.

for the eagle delivery, all files that are different are already included in .../delivery/20101021-Eagle/EUFAR10_01

comment:12 Changed 14 years ago by knpa

Appears to be an issue with the bandset labels in the header files; they start at 900nm which is lower than it should be. Possibly incorrect bandset selected or none specified. Will leave this until end of the year and new Hawk calibration.

comment:13 Changed 14 years ago by emca

Camera delivery check complete. No issues.
~/airborne/workspace/EU10_03-2010_238c_Lake_Balaton_Peninsula/delivery/20101020/EU10_03
Ready for delivery

comment:14 Changed 14 years ago by emca

Delivery checked Eagle data.
~airborne/workspace/EU10_03-2010_238c_Lake_Balaton_Peninsula/delivery/20101021/EU10_03
Made some small changed to Readme. Ready to deliver.

comment:15 Changed 14 years ago by emca

  • Description modified (diff)

Eagle and Camera data dispatched to PI 27/10/2010

comment:16 Changed 14 years ago by emca

Note above delivery relates to A Tyler. This data also needs to be sent to A Zlinszky.

comment:17 Changed 14 years ago by iopa

  • Description modified (diff)

Dispatched Eagle and Camera to Dr. Zlinszky on 28/10/2010.

comment:18 Changed 14 years ago by anch

Starting Hawk processing

comment:19 Changed 14 years ago by anch

Submitted for delivery check

comment:20 Changed 14 years ago by emca

Delivery check the Hawk data at
~airborne/workspace/EU10_03-2010_238c_Lake_Balaton_Peninsula/delivery/20110110/

Data looks good.
Readme: mention Hawk regular dropped frames; typo in Quality and issues section "andi" should be "and"
Project name on logsheet does not match the Readme - which is correct?
Dem is symlinked - will this copy for the delivery? We are delivering the same DEM several times so can leave it out, with relevant changes to readme, but maybe should be included for archiving.

comment:21 Changed 14 years ago by anch

  • Summary changed from EU10/03 & EUFAR10/01, flight day 238c/2010, Lake Balaton Peninsula to EU10/03 & EUFAR10/01, flight day 238c/2010, Kis Balaton

Indeed an incorrect name was used for the site name for the directory and ticket.

I have (Hopefully) fixed this now so the project site is now "Kis Balaton", not "Lake Balaton Peninsula".

Previously delivered Readme PDFs have been left as they were, but I will update my recent Hawk delivery to reflect the name change.

comment:22 Changed 14 years ago by anch

  • Owner set to anch
  • Status changed from new to assigned

comment:23 Changed 14 years ago by anch

  • Description modified (diff)

Hawk delivered 28/01/2011

comment:24 Changed 14 years ago by knpa

  • Description modified (diff)

Updated description with new data location (taking into account project name change).
Also updated status spreadsheet with new name "Kis Balaton".

comment:25 Changed 14 years ago by emca

Starting LiDAR processing

comment:26 Changed 14 years ago by anch

LiDAR sent to PI at his request despite not being roll corrected or classified

comment:27 Changed 14 years ago by emca

LiDAR ready for delivery check at
~airborne/workspace/EU10_03-2010_238c_Kis_Balaton/delivery/20110318/

comment:28 Changed 14 years ago by anch

  • Summary changed from EU10/03 & EUFAR10/01, flight day 238c/2010, Kis Balaton to EU10/03 & EUFAR10/01 (AIMWETLAB), flight day 238c/2010, Kis Balaton

comment:29 Changed 14 years ago by knpa

Taking LIDAR delivery check.

comment:30 Changed 14 years ago by knpa

  • Owner changed from anch to emca

Delivery check finished, no problems found.

A copy of this delivery needs to be created for Dr Zlinszky also (Let me know when you've done this and I'll put it on my disk).

K

comment:31 Changed 14 years ago by emca

  • Description modified (diff)

LiDAR data sent to A Tyler 19/04/2011