Opened 14 years ago
Last modified 12 years ago
#388 assigned flight processing
GB11/00, Flight day 082/2011, Little Rissington — at Version 8
Reported by: | benj | Owned by: | knpa |
---|---|---|---|
Priority: | immediate | Milestone: | 2011 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | knpa, emca | Other processors: | knpa, emca |
Description (last modified by knpa)
Data location: ~arsf/arsf_data/2011/flight_data/arsf_internal/GB11_00-2011_082_little_riss
Data arrived from ARSF via network transfer on 24/03/11.
Scientific objective: N/A (calibration flight)
Priority: Immediate
Calibration flight
Sensors:
- Eagle (done)
- Hawk (done)
- Leica LIDAR (done)
- RCD (done)
Change History (9)
comment:1 Changed 14 years ago by benj
comment:2 Changed 14 years ago by knpa
The repeat flightlines are 4 and 23, both of which go South at ~750m.
comment:3 Changed 14 years ago by knpa
There are very large SCT offsets for the two lines produced so far (4 and 23, both Eagle and Hawk). This is unusual in that this degree of error is usually only present when no sync information is available, however no such error was reported and the lines processed through cleanly.
comment:4 Changed 14 years ago by knpa
Large offset was found to be due to AZ not applying an offset of 15 leap seconds which is necessary when converting to UTC from GPS time. Bill will look into this problem when we send him some sample files.
comment:5 Changed 14 years ago by knpa
Bill has found the problem and will send us corrections with the next software update.
comment:6 Changed 14 years ago by emca
LiDAR data has been processed and reg file saved under
~arsf/calibration/lidar/20110323
Roll issue as described here #257 is still present in this data.
Data has also been made available to Leica Support.
comment:7 Changed 13 years ago by iopa
Eagle/Hawk have been boresighted using the IPAS IMU SOL -> SBET navigation
with the below leverarms;
eagle_leverarm = 0.415 -0.014 -0.129
hawk_leverarm = 0.585 -0.014 -0.129
and resulted in the below boresight offets (PRH);
eagle_boresight = -0.322 0.175 0.38
hawk_boresight = -0.345 0.29 0.35
Changed 13 years ago by iopa
Eagle & Hawk SCT offsets for the lines used for boresighting, used with aplsuite, these offsets include the global -0.055
comment:8 Changed 12 years ago by knpa
- Component changed from Processing: general to Archiving
- Description modified (diff)
- Milestone set to 2011 data processing completion
- Owner changed from benj to knpa
- Status changed from new to assigned
Beginning archiving.
Note Eagle and Hawk raw file names both had incorrect naming convention, have amended the raw filenames