Opened 14 years ago

Last modified 13 years ago

#401 assigned flight processing

EU11/03, flight day 142/2011, Jimena — at Version 17

Reported by: knpa Owned by:
Priority: alpha 4 low Milestone: 2011 data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by adbe)

Data location: /users/rsg/arsf/arsf_data/2011/flight_data/spain_portugal/EU11_03-2011_142_Jimena

Data arrived from ARSF via network transfer on 24/05/2011

EU11/03 Scientific objective: We wish to measure how these forests change over gradients of topography‐controlled climate and soil properties

EU11/03 Priority: Alpha 4l

PI: David Coomes

Sensors:

Camera
Eagle (15/08/2011)
Hawk (15/08/2011)
LiDAR (15/08/2011)
Camera (18/07/2011)

Change History (17)

comment:1 Changed 14 years ago by knpa

  • Description modified (diff)

comment:2 Changed 13 years ago by anch

Processing RAW camera to tif

comment:3 Changed 13 years ago by anch

Processing IPAS

comment:4 Changed 13 years ago by anch

Produced thumbnails from tifs

comment:5 Changed 13 years ago by anch

IPAS processed.

Produced sol with LIDAR and camera lever arms, and converted one to SBET for hyperspectral processing.

comment:6 Changed 13 years ago by anch

Produced camera ImageEvents1_processed file with IPAS CO

comment:7 Changed 13 years ago by benj

LiDAR processing currently blocked until we get a new boresight flight

comment:8 Changed 13 years ago by benj

Will Simonson obtained additional base station data for SFER base station for this flight date, have downloaded it and put it with the rest of the data for this flight in the repository.

comment:9 Changed 13 years ago by anch

Reprocessed the navigation with new basestation data and got a much better result.

Have generated new SOL files for camera, lidar and SBET for hyperspectral.

Have recreated the camera delivery with reprocessed SOL file and it is ready for delivery check.

Have started processing hyperspectral data with new SBET.

comment:10 Changed 13 years ago by iopa

Camera delivery check ;

  • readme proj code _ to / if tex is available

otherwise all is good and ready to go.

comment:11 Changed 13 years ago by anch

Putting SCT correction on hold until LiDAR can be processed so that it can be verified against an intensity image

comment:12 Changed 13 years ago by emca

  • Description modified (diff)

Camera data sent to PI 18/07/2011

comment:13 Changed 13 years ago by jaho

Obtained intensity image to use for SCT correction. Continuing eagle and hawk processing.

comment:14 Changed 13 years ago by jaho

Hyperspectral data ready for delivery check.

comment:15 Changed 13 years ago by jaho

LIDAR delivery check:

No errors found. Data ready to deliver.

comment:16 Changed 13 years ago by adbe

Delivery check complete.
Data ready to deliver

comment:17 Changed 13 years ago by adbe

  • Description modified (diff)

Data has been delivered
Data on disk 112: -

-142 lidar
-142 hyperspectral
-141 lidar

Delivered to David Coombes on 15/08/2011

Note: See TracTickets for help on using tickets.