Opened 14 years ago
Last modified 13 years ago
#401 assigned flight processing
EU11/03, flight day 142/2011, Jimena — at Version 17
Reported by: | knpa | Owned by: | |
---|---|---|---|
Priority: | alpha 4 low | Milestone: | 2011 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by adbe)
Data location: /users/rsg/arsf/arsf_data/2011/flight_data/spain_portugal/EU11_03-2011_142_Jimena
Data arrived from ARSF via network transfer on 24/05/2011
EU11/03 Scientific objective: We wish to measure how these forests change over gradients of topography‐controlled climate and soil properties
EU11/03 Priority: Alpha 4l
PI: David Coomes
Sensors:
Camera
Eagle (15/08/2011)
Hawk (15/08/2011)
LiDAR (15/08/2011)
Camera (18/07/2011)
Change History (17)
comment:1 Changed 14 years ago by knpa
- Description modified (diff)
comment:2 Changed 13 years ago by anch
comment:3 Changed 13 years ago by anch
Processing IPAS
comment:4 Changed 13 years ago by anch
Produced thumbnails from tifs
comment:5 Changed 13 years ago by anch
IPAS processed.
Produced sol with LIDAR and camera lever arms, and converted one to SBET for hyperspectral processing.
comment:6 Changed 13 years ago by anch
Produced camera ImageEvents1_processed file with IPAS CO
comment:7 Changed 13 years ago by benj
LiDAR processing currently blocked until we get a new boresight flight
comment:8 Changed 13 years ago by benj
Will Simonson obtained additional base station data for SFER base station for this flight date, have downloaded it and put it with the rest of the data for this flight in the repository.
comment:9 Changed 13 years ago by anch
Reprocessed the navigation with new basestation data and got a much better result.
Have generated new SOL files for camera, lidar and SBET for hyperspectral.
Have recreated the camera delivery with reprocessed SOL file and it is ready for delivery check.
Have started processing hyperspectral data with new SBET.
comment:10 Changed 13 years ago by iopa
Camera delivery check ;
- readme proj code _ to / if tex is available
otherwise all is good and ready to go.
comment:11 Changed 13 years ago by anch
Putting SCT correction on hold until LiDAR can be processed so that it can be verified against an intensity image
comment:12 Changed 13 years ago by emca
- Description modified (diff)
Camera data sent to PI 18/07/2011
comment:13 Changed 13 years ago by jaho
Obtained intensity image to use for SCT correction. Continuing eagle and hawk processing.
comment:14 Changed 13 years ago by jaho
Hyperspectral data ready for delivery check.
comment:15 Changed 13 years ago by jaho
LIDAR delivery check:
No errors found. Data ready to deliver.
comment:16 Changed 13 years ago by adbe
Delivery check complete.
Data ready to deliver
comment:17 Changed 13 years ago by adbe
- Description modified (diff)
Data has been delivered
Data on disk 112: -
-142 lidar
-142 hyperspectral
-141 lidar
Delivered to David Coombes on 15/08/2011
Processing RAW camera to tif