Opened 14 years ago
Last modified 13 years ago
#401 assigned flight processing
EU11/03, flight day 142/2011, Jimena — at Version 26
Reported by: | knpa | Owned by: | knpa |
---|---|---|---|
Priority: | alpha 4 low | Milestone: | 2011 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by knpa)
Data location: /users/rsg/arsf/arsf_data/2011/flight_data/spain_portugal/EU11_03-2011_142_Jimena
Data arrived from ARSF via network transfer on 24/05/2011
EU11/03 Scientific objective: We wish to measure how these forests change over gradients of topography‐controlled climate and soil properties
EU11/03 Priority: Alpha 4l
PI: David Coomes
Sensors:
Eagle (15/08/2011)
Hawk (15/08/2011)
LiDAR (15/08/2011) and (29/03/12)
Camera (18/07/2011)
Change History (26)
comment:1 Changed 14 years ago by knpa
- Description modified (diff)
comment:2 Changed 13 years ago by anch
comment:3 Changed 13 years ago by anch
Processing IPAS
comment:4 Changed 13 years ago by anch
Produced thumbnails from tifs
comment:5 Changed 13 years ago by anch
IPAS processed.
Produced sol with LIDAR and camera lever arms, and converted one to SBET for hyperspectral processing.
comment:6 Changed 13 years ago by anch
Produced camera ImageEvents1_processed file with IPAS CO
comment:7 Changed 13 years ago by benj
LiDAR processing currently blocked until we get a new boresight flight
comment:8 Changed 13 years ago by benj
Will Simonson obtained additional base station data for SFER base station for this flight date, have downloaded it and put it with the rest of the data for this flight in the repository.
comment:9 Changed 13 years ago by anch
Reprocessed the navigation with new basestation data and got a much better result.
Have generated new SOL files for camera, lidar and SBET for hyperspectral.
Have recreated the camera delivery with reprocessed SOL file and it is ready for delivery check.
Have started processing hyperspectral data with new SBET.
comment:10 Changed 13 years ago by iopa
Camera delivery check ;
- readme proj code _ to / if tex is available
otherwise all is good and ready to go.
comment:11 Changed 13 years ago by anch
Putting SCT correction on hold until LiDAR can be processed so that it can be verified against an intensity image
comment:12 Changed 13 years ago by emca
- Description modified (diff)
Camera data sent to PI 18/07/2011
comment:13 Changed 13 years ago by jaho
Obtained intensity image to use for SCT correction. Continuing eagle and hawk processing.
comment:14 Changed 13 years ago by jaho
Hyperspectral data ready for delivery check.
comment:15 Changed 13 years ago by jaho
LIDAR delivery check:
No errors found. Data ready to deliver.
comment:16 Changed 13 years ago by adbe
Delivery check complete.
Data ready to deliver
comment:17 Changed 13 years ago by adbe
- Description modified (diff)
Data has been delivered
Data on disk 112: -
-142 lidar
-142 hyperspectral
-141 lidar
Delivered to David Coombes on 15/08/2011
comment:18 Changed 13 years ago by adbe
- Component changed from Processing: general to Archiving
- Owner set to benj
comment:19 Changed 13 years ago by knpa
- Milestone set to 2011 data processing completion
- Owner changed from benj to adbe
- Status changed from new to assigned
comment:20 Changed 13 years ago by mark1
Hyperspectral hawk bad pixel files and XML files have been re-created and re-delivered to PI (via email). This corrects sample number in bad pixel text files and Eagle IFOV value in XML and extra comments included.
comment:21 Changed 13 years ago by adbe
Hyperspectral sct's
line | eagle | hawk |
1 | -0.05 | -0.05 |
2 | -0.02 | -0.07 |
3 | -0.04 | -0.03 |
4 | -0.5 | -0.10 |
5 | -0.12 | 0.04 |
6 | -0.11 | -0.11 |
7 | -0.01 | -0.02 |
8 | -0.09 | -0.05 |
9 | -0.04 | -0.04 |
10 | -0.03 | -0.04 |
11 | -0.05 | -0.05 |
12 | -0.03 | -0.05 |
13 | -0.05 | -0.08 |
14 | -0.04 | -0.08 |
15 | -0.04 | -0.03 |
16 | -0.03 | -0.05 |
17 | -0.01 | -0.02 |
18 | -0.02 | 1.17 |
comment:22 Changed 13 years ago by emca
Received an email from Will Simonson 09/02/2012 to say the data did not
match up with overlapping lines from day 102 (ticket #395 ).
Vertical offset ~1.2 meters and horizontal shift visible. Reprocessed
the navigation data using a network adjusted temporary base station.
Original data was processed without the correct IBRC file. Data was also
found to have a pitch offset.
Have reprocessed the data and made available to W Simonson via ftp.
comment:24 Changed 13 years ago by knpa
No project information xml was included with the delivery.
comment:25 Changed 13 years ago by knpa
- Description modified (diff)
comment:26 Changed 13 years ago by knpa
- Description modified (diff)
Processing RAW camera to tif