Opened 13 years ago
Last modified 9 years ago
#402 assigned flight processing
CAM11_03, flight day 141/2011, Madrid — at Version 11
Reported by: | knpa | Owned by: | iopa |
---|---|---|---|
Priority: | alpha 4 high | Milestone: | 2011 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by anch)
Data location: /users/rsg/arsf/arsf_data/2011/flight_data/spain_portugal/CAM11_03-2011_141_Madrid
Data arrived from ARSF via network transfer on 24/05/2011
CAM11_03 Scientific objective: We wish to measure how these forests change over gradients of topography‐controlled climate and soil properties.
CAM11_03 Priority: Alpha 4h
PI: David Coomes
Sensors:
Camera (requested)
Eagle (27/06/2011)
Hawk (27/06/2011)
LiDAR (requested)
Note: This project is actually part of EU11_03 but has a different project code as it was funded separately, and has higher priority.
Change History (11)
comment:1 Changed 13 years ago by knpa
- Description modified (diff)
comment:2 Changed 13 years ago by iopa
comment:3 Changed 13 years ago by iopa
Camera is ready for checking @ ~arsf/arsf_data/2011/flight_data/spain_portugal/CAM11_03-2011_141_Madrid/processing/delivery/camera-CAM11_03-100-20110615
Raw images taken during preparation and removed ;
1-28
Raw images with cloud or saturation and removed ;
155,194,276,607-615,699
comment:4 Changed 13 years ago by knpa
- Milestone set to 2011 data processing completion
- Owner set to iopa
- Status changed from new to assigned
Taking Camera delivery check.
comment:5 Changed 13 years ago by knpa
Delivery check complete. All looks good apart from:
- Looks like the calibration certificate from last year. Is that OK?
- Noticed in the tiff tags that the gps time is given as 10/04/11, not 10/05/11 when the project was flown.
comment:6 Changed 13 years ago by benj
LiDAR processing currently blocked until we get a new boresight flight
comment:7 Changed 13 years ago by anch
Hyperspectral ready for delivery check
comment:8 Changed 13 years ago by knpa
Taking hyperspectral delivery check.
comment:9 Changed 13 years ago by knpa
Delivery check complete.
All looks good apart from:
- Logsheet top section has lots missing. Can fill this out from the scanned logsheet.
- Readme: aplcorr command needs altering. e141011b_post_processed_nav.bil should be e141011b_nav_post_processed.bil (script needs editing also)
- Blank bands at 127 and 0 (eagle)
- Blank band at 0 (hawk)
comment:10 Changed 13 years ago by anch
Issues with delivery resolved.
Now putting the delivery on a disk
comment:11 Changed 13 years ago by anch
- Description modified (diff)
Hawk and Eagle data sent to PI on 27/06/2011
Taking LiDAR and camera.