Opened 13 years ago

Last modified 8 years ago

#407 assigned flight processing

EU10/01, flight day 178/2011, Norrunda — at Version 20

Reported by: anch Owned by: knpa
Priority: immediate Milestone: 2011 data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by knpa)

Data location: /users/rsg/arsf/arsf_data/2011/flight_data/sweden/EU10_01-2011_178_Norrunda

Data arrived from ARSF via network transfer on 13/07/2011

EU10/01 Scientific objective:

  1. To provide better understanding of the key impact factors on CO2 and H2O fluxes of mixed forest stands
  1. To reduce uncertainty in the upscaling of greenhouse gas fluxes to a regional or even global scale.

EU10/01 Priority: a5

PI: Natascha Kljun

Sensors:

Camera (26/07/11)
Eagle (09/09/11)
Hawk (09/09/11)
LiDAR (09/09/11)

Change History (20)

comment:1 Changed 13 years ago by anch

Starting navigation processing

comment:2 Changed 13 years ago by knpa

  • Owner set to anch
  • Status changed from new to assigned

Created binary dem for HS use at ~/dems/sweden_norrunda

comment:3 Changed 13 years ago by anch

Finished navigation processing.

Created SOL file, camera.sol file and sbet

comment:4 Changed 13 years ago by knpa

  • Owner changed from anch to knpa

.las files created

comment:5 Changed 13 years ago by adbe

Started hyperspectral processing.

Renamed hyperspectral RAW files (Added VNIR and SWIR) to generate runscripts.

comment:6 Changed 13 years ago by jaho

Removed camera images 1 - 12 (taken before the flights).

comment:7 Changed 13 years ago by adbe

Processing Hyperspectral-found heading offset in flightline 34

comment:8 Changed 13 years ago by knpa

  • Description modified (diff)

Correct PI name (Klujn to Kljun)

comment:9 Changed 13 years ago by jaho

Camera is ready for delivery check.

comment:10 Changed 13 years ago by adbe

Hyperspectral is ready for delivery check

comment:11 Changed 13 years ago by knpa

Finished Camera delivery check. All looks good and ready to deliver apart from:

  • PI name is spelt incorrectly (should be Kljun)

comment:12 Changed 13 years ago by jaho

Corrected PI name in both camera and hyperspectral ReadMe.

comment:13 Changed 13 years ago by emca

Delivery checking hyperspectral data

comment:14 Changed 13 years ago by emca

Hyperspectral delivery check complete.

DEM and logsheet names need to be changed to match naming convention. Also update readme for DEM name change.
Readme is missing full stop at the end of the section on 'Quality and issues with data'.
DEM section seems squashed together like the spaces between paragraphs have been removed - maybe check this.
Logsheet is missing a lot of information (PI, proj code, comments etc). This needs to be filled in. The information is available from the Ops version.
Apl mapping guide is missing from docs.
Project information xml is missing.

Data itself is fine.

comment:15 Changed 13 years ago by jaho

Camera sent to Natascha Kljun at 26/07/2011.

comment:16 Changed 13 years ago by adbe

  • Have renamed DEM and logsheet
  • Fixed the heading offset in the final flight line
  • Added skips to the tex file
  • Added information to logsheet
  • Added apl mapping guide
  • Added xml file

comment:17 Changed 13 years ago by knpa

LIDAR - QC of horizontal and vertical discrepancies. All looks fine apart from last two lines (12:04 Nor1 & 12:15 Norx) which have horizontal discrepancies.

comment:18 Changed 13 years ago by knpa

LIDAR delivery ready for checking at: ~knpa/2011_arsf_data/sweden_svalbard/EU10_01-2011_178_Norrunda/processing/delivery/EU10_01-178-lidar-20110905

comment:19 Changed 13 years ago by adbe

Logsheet has Carl Jozef as pilot
Other than that the data is ready to deliver

comment:20 Changed 13 years ago by knpa

  • Component changed from Processing: general to Archiving
  • Description modified (diff)

Above fix made.
LiDAR and Hyperspectral delivered today (09/09/11)

Note: See TracTickets for help on using tickets.