Opened 13 years ago
Last modified 13 years ago
#417 assigned flight processing
EM10/06, flight day 260/2011, Italy — at Version 19
Reported by: | knpa | Owned by: | emca |
---|---|---|---|
Priority: | alpha 4 medium | Milestone: | 2011 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by adbe)
Data location: /users/rsg/arsf/arsf_data/2011/flight_data/italy/EM10_06-2011_260_Italy
Data arrived from ARSF via network transfer on 28/09/2011
EM10/06 Scientific objective:
Earthquake study in Italy by examination of geology.
EM10/06 Priority: a4m
PI: Ken McCaffrey
Notes: This project was previously flown in Greece last year but the data was confiscated.
Sensors:
Camera (25/11/2011)
Eagle (25/11/2011)
Hawk (25/11/2011)
LiDAR (25/11/2011)
Change History (19)
comment:1 Changed 13 years ago by knpa
- Description modified (diff)
comment:2 Changed 13 years ago by adbe
comment:3 Changed 13 years ago by adbe
Processed navigation: poor quality (best solution)
comment:4 Changed 13 years ago by adbe
Started camera processing
comment:5 Changed 13 years ago by emca
Blocking LiDAR processing:
Processing of day 265 shows very low intensity values and max AGC values. This is possibly due to the high altitude of flight during data collection. Querying with Ops.
comment:6 Changed 13 years ago by adbe
Camera ready for delivery check
comment:7 Changed 13 years ago by knpa
Checking camera.
comment:8 Changed 13 years ago by knpa
Camera delivery check completed.
No problems, ready to deliver.
comment:9 Changed 13 years ago by emca
Processing LiDAR data.
The data will need to be flagged as bad in the delivery due to the intensity issues mentioned above. We presently have no way to correct the intensity or to compensate for the incorrect elevation values.
comment:10 Changed 13 years ago by jaho
Started hyperspectral processing.
comment:11 Changed 13 years ago by jaho
Hyperspectral ready for delivery check.
comment:12 Changed 13 years ago by emca
Processing LiDAR data.
Classifying the points. Due to the large tree height a lot of ground points were misclassified as noise. Reclassified (using -isolated 12 1) to try to retain the ground hits as valid data and still identify the random high/low points as noise. Some mis-classified points may remain in the data but this seemed to be the best compromise.
comment:13 Changed 13 years ago by adbe
Hyperspectral Delivery Check:
- Mention in ReadMe that eagle bands 0 and 254 are blank (first and last)
Otherwise, ready to deliver.
comment:14 Changed 13 years ago by jaho
ReadMe updated.
comment:15 Changed 13 years ago by emca
LiDAR data ready for delivery check.
Missing pdf readme but tex version should be available (left it running).
comment:16 Changed 13 years ago by adbe
LiDAR delivery check:
- There is a file "u2dtmpH1a9EU" in the ascii directory
- DEM is gridded at 5.0 metre pixels, usually 2.0
Otherwise, ready to deliver
comment:17 Changed 13 years ago by jaho
Removed u2dtmpH1a9EU.
comment:18 Changed 13 years ago by adbe
Camera, Hyperspectral and LiDAR delivered to Ken McCaffrey on 25/11/2011 on disk 102
comment:19 Changed 13 years ago by adbe
- Description modified (diff)
Started to process navigation