Opened 13 years ago
Last modified 12 years ago
#424 assigned flight processing
GB11/00, flight day 301/2011, Little Rissington — at Version 1
Reported by: | emca | Owned by: | |
---|---|---|---|
Priority: | immediate | Milestone: | 2011 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by emca)
Data location: ~arsf/arsf_data/2011/flight_data/arsf_internal/GB11_00-2011_301_Little_Rissington
Data arrived from ARSF via network transfer on 31/10/2011
GB11/00 Scientific objective: ARSF boresight flight.
GB11/00 Priority: urgent
PI: ARSF Internal
Notes:
This flight was to check the validity of the Specim timing fix and to check if the LiDAR calibration was stable.
Sensors:
Camera (Flown but not required)
Eagle (Requested)
Hawk (Requested)
LiDAR (Requested)
Note: See
TracTickets for help on using
tickets.