Opened 10 years ago
Last modified 8 years ago
#558 closed flight processing
MA14/21, flight day 296/2014, Sepilok — at Version 9
Reported by: | dap | Owned by: | |
---|---|---|---|
Priority: | whenever | Milestone: | |
Component: | Processing: general | Keywords: | |
Cc: | Other processors: |
Description (last modified by dap)
Data location: ~arsf/arsf_data/2014/flight_data/malaysia/MA14_21-2014_296_Sepilok
Data arrived from ARSF via network transfer on 05/01/2015.
Scientific objective: Quantifying the accuracy of current estimates of forest biomass by combining data retrieved from state-of-the-art ground-based laser scanner with airborne data.
PI: Mathias Disney
All Fenix header files have large differences between their fps_set and fps_qpf values (differences are between 0.278 and 0.673).
Basestation data are in DBX format.
OWL data were not collected.
Sensors:
- Fenix (requested)
- LiDAR (requested)
- FW LiDAR (requested)
- RCD (not requested)
Change History (9)
comment:1 Changed 10 years ago by dap
- Description modified (diff)
comment:2 Changed 10 years ago by dap
comment:3 Changed 9 years ago by dac
Basestation Processing
Basestation data looked like it contained two locations. Subset to GPS time 345600 - 354600 in GrafNav. Subset data processed OK. Antenna height wasn't set.
Lat 5 53 54.43758
Lon 118 03 55.38562
El. Height 65.953
comment:4 Changed 9 years ago by tec
Navigation Processing
IPAS TC still not happy, now complaining that sta.gpb does not exist.
Processed in grafnav, el mask set to 14.0deg.
Nav done. Copying back now
comment:5 Changed 9 years ago by tec
RCD Processing
Finished, ready for DC
comment:6 Changed 9 years ago by lah
RCD
Delivery check completed - ready for delivery
comment:7 Changed 9 years ago by dac
LiDAR Processing
Started lidar processing.
comment:8 Changed 9 years ago by dap
Starting Fenix Processing
comment:9 Changed 9 years ago by dap
- Description modified (diff)
PI would like data to be delivered by USB hard drive and FTP.