Opened 3 years ago
Last modified 14 months ago
#679 new flight processing
Magic, flight day 233a/2021, Kiruna, Sweden
Reported by: | wja | Owned by: | |
---|---|---|---|
Priority: | immediate | Milestone: | |
Component: | Processing: general | Keywords: | |
Cc: | Other processors: |
Description (last modified by wja)
Data location: /users/rsg/arsf/arsf_data/2021/flight_data/sweden/Magic-2021_233a_Kiruna/
Data arrived from Kings College London via hardrive from Sweden on September 20th 2021.
Scientific objective: International project (includes NASA, CNRS, ESA, DLR, Eumetsat) to monitor and identify methane inventories in the arctic. JPL's HyTES instrument was utilised. A total of three aircraft were used to collect data, along with deployed balloons and ground measurments.
PI: Martin Wooster
Change History (18)
comment:1 Changed 3 years ago by wja
comment:2 Changed 3 years ago by wja
- Description modified (diff)
comment:3 Changed 3 years ago by wja
Nav Processing
233a nav processing
Basestation in Leica format and has intermittent coverage of the days 199, 200, 203, 210, 228, 229 & 233.
Day 233 comprises:
- Start: 21/8 12:04
- Issue at 12:07 (apparently gap of 330908 seconds? or change in recording rate?)
- End: 21/8 17:03
Have extracted the period of day 223 from 12:08 to 17:03 with the following command:
teqc -st 210821120800 -e 210821170300 +nav rinex/2021233a.21n Default_9488_0718_111526.m00 > rinex/2021233a.21o
The following warning was raised by POSPac when importing basestation data:
:\data\scratch\arsf\2021\flight_data\sweden\Magic-2021_233a_Kiruna\processing\basestation_proc\rinex\2021233a.21o Date created: 10/15/2021 2:21:40 PM Date imported: 10/15/2021 2:22:50 PM Errors: 1 1. Unrecognized receiver with serial number: '469488'. Unknown receiver created.
Continued doing single base station processing chain:
1) Compute RTX Coordiantes:
- Horizontal sigma: 0.012 m
- Vertical sigma: 0.013 m
2) Set base station
3) IN-Fusion Single Base processing
Position Error RMS is low according the exported POSPac QC report:
- Vertical < 3 cm apart from two spikes < 4 cm
- Horizontal error < 3cm
comment:4 Changed 3 years ago by wja
Hyperspectral Processing
Processing 3 RGB band flightlines to check geo-accuracy.
Issue with aplcal:
########## ERROR ######### Error on line: 0 A number of bands in the raw file disagree with the calibration file wavelengths. Number that agree: 0 Number of bands: 87 This probably means that the calibration file and raw file are not compatible. Maybe the wrong bandset / config file has been used at data collection. ########## ERROR #########
Will try updating wavelengths in Fenix1k header files.
All these flightlines have a VNIR binning factor of 8.
The following command was used:
replace_wavscale.py -w /users/rsg/arsf/calibration/2021/fenix1k/wlcal8b_vnir_1b_swir.txt hyperspectral/fenix/F*/capture/*hdr --final
Majority of 3 band RGB mapped data is predominantly green or red. Could be related to an underflow but I am unsure why it would only affect a single section of a flightline. Will investigate. These bands also look noisey.
comment:5 Changed 3 years ago by wja
Hyperspectral Processing
3 band data is fine. The green nad red was just a result of contrast stretching done by Tuiview.
comment:6 Changed 3 years ago by dac
Digital Camera Processing
Started converting raw PhaseOne images to Tiff.
comment:7 Changed 3 years ago by dac
Digital Camera Processing
All raw images converted to tiff.
comment:9 Changed 3 years ago by wja
Hyperspectral Processing
All lines processed with all bands (except line 11). Creating delivery
comment:10 Changed 3 years ago by wja
Ready for Checking
Created Fenix1K delivery.
comment:11 Changed 2 years ago by mark1
Hyperspectral delivery check:
- Missing project_information XML
- Add a note to the logsheet that line 11 data were unable to be processed
Otherwise looked good. Not zipped the mapped data.
comment:12 Changed 2 years ago by wja
Delivery Check
Apologies for the delay on this.
- Have added project XML.
- Have added note in ReadMe about line 11 not being processed. Should we add a note on logsheet also?
- Mapped data zipping
comment:13 Changed 2 years ago by wja
Delivery
Have updated logsheet with note about line 11 failing.
Should be ready to deliver
comment:14 Changed 2 years ago by wja
Delivery
Finalised, put on FTP slot 5
comment:15 Changed 2 years ago by wja
Delivery Sent
PI notifified
comment:16 Changed 15 months ago by wja
Archiving
Created JSONs, committed them to database.
Ready to sync to CEDA.
comment:17 Changed 15 months ago by wja
Archiving
Started transfer to CEDA. 08/09/2023 16:20
comment:18 Changed 14 months ago by wja
Transfer complete
Unpacking