Timeline
May 24, 2018:
- 10:38 AM AboutUs edited by
 - Added a NERC and updated link (diff)
 - 10:33 AM AboutUs edited by
 - (diff)
 
May 15, 2018:
- 3:51 PM Ticket #628 (GB18_00, flight day 129/2018, Boresight) created by
 - Data location: …
 - 9:14 AM Processing/GNSSStatinons edited by
 - (diff)
 - 9:07 AM Processing/GNSSStatinons edited by
 - (diff)
 
May 9, 2018:
- 6:23 PM Procedures/HyperspectralCalibrationCreation edited by
 - (diff)
 - 6:23 PM Procedures/HyperspectralCalibrationCreation edited by
 - (diff)
 - 6:21 PM Ticket #627 (Fenix Calibration, 2018) created by
 - This ticket records the calibration of the Fenix sensor. The Fenix …
 
May 2, 2018:
- 9:18 AM Processing/atcor edited by
 - Added instructions for running atmospheric correction on NERC-ARF system. (diff)
 
May 1, 2018:
- 5:26 PM Processing/LidarClassification edited by
 - (diff)
 - 5:23 PM Processing/LidarClassification edited by
 - (diff)
 - 12:37 PM Procedures edited by
 - (diff)
 
Note: See TracTimeline
        for information about the timeline view.