Changes between Version 65 and Version 66 of Procedures/EagleHawkProcessing
- Timestamp:
- Jun 4, 2013, 5:15:23 PM (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Procedures/EagleHawkProcessing
v65 v66 30 30 * transform_projection is correct for the data 31 31 32 If using SBETs from IPAS to process the hyperspectral make sure to use these lever arm values (referenced from pav80 not GPS antenna. They should be automatically selected according to the year but best to check): 32 The boresight and lever arm are pulled automatically from the tables located at: 33 /users/rsg/arsf/usr/share/leverarm_values.csv 34 /users/rsg/arsf/usr/share/boresight_values.csv 33 35 34 Eagle : 0.415 -0.014 -0.129[[BR]] 35 Hawk : 0.585 -0.014 -0.129 36 37 And use these boresight values (PRH): 38 39 Eagle : -0.322 0.175 0.38[[BR]] 40 Hawk : -0.345 0.29 0.35 41 36 Check with someone that these are appropriate for your flight if you're not sure. 42 37 43 38 === Submitting processing to gridnodes ===