Changes between Version 46 and Version 47 of Procedures/EndUserDelivery


Ignore:
Timestamp:
May 13, 2009, 12:58:18 PM (16 years ago)
Author:
mark1
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Procedures/EndUserDelivery

    v46 v47  
    8080Once a dataset has been prepared for burning and delivery, a second person should go over it and:
    8181=== For Hyperspectral Data ===
    82  1. Verify we have the correct PI (check against application, call Kidlington if unsure) and address (application, google, Kidlington)
     82 1. Verify we have the correct PI (check against application, call Gloucester if unsure) and address (application, google, Gloucester)
    8383 1. Check against the logsheet that all data that should be present is.
    8484 1. Check for typos, etc in the documentation.
     
    8787 1. All level 1 files should be looked at visually (ideally in all bands, though this is only practical for ATM and casi).
    8888=== For LIDAR Data ===
    89  1. Verify we have the correct PI (check against application, call Kidlington if unsure) and address (application, google, Kidlington)
     89 1. Verify we have the correct PI (check against application, call Gloucester if unsure) and address (application, google, Gloucester)
    9090 1. Check against the logsheet that all data that should be present is.
    9191 1. Check for typos, etc in the documentation.