Changes between Version 75 and Version 76 of Procedures/EndUserDelivery


Ignore:
Timestamp:
Sep 9, 2009, 2:17:44 PM (15 years ago)
Author:
knpa
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Procedures/EndUserDelivery

    v75 v76  
    7373   * Fill in the contents: Add the filenames and line numbers/names
    7474   * Enter the projection and datum details - get these from ALS PP output dialog when processing.
    75      * UK flights should be Horizontal datum: ETRF89 Vertical Datum: Newlyn Projection: OSTN02 British National Grid
     75     * UK flights should be - Horizontal Datum: "ETRF89" Vertical Datum: "Newlyn" Projection: "OSTN02 British National Grid"
    7676   * Insert statistics for each line: `lasinfo --check <lidarfilename>` then cut/paste the required information
    7777   * Check the accuracy of data vs vectors and estimate the average offset, also the average elevation offset between neighbouring lines