Data Delivery
Preparation
What should be included
- level 1 data that has been mapped to level 3 successfully and verified as correctly geolocated (as far as possible).
- a readme file describing the contents of the delivery
- flight logsheet
- screenshots (level 3)
- one of each line (no vectors)
- mosaic of all lines for a single sensor, one with and one without vectors overlaid
- each screenshot should try to show typical or noteworthy characteristics of the image - e.g. any distortion or error, or a typical part of the scene
- (2008+?) a DEM file where we have one and can give it to the user
- any ancillary files (spheroid separation grids for non-UK flights, OS GB correction factors, etc)
There are delivery template directories available (copy these and populate):
- 2006
- ~arsf/arsf_data/in_progress/2006/delivery_template/
- 2007
- ~arsf/arsf_data/in_progress/2007/delivery/template/
- 2008
- ~arsf/arsf_data/in_progress/2008/delivery/template/
The delivery data should be created in the project directory named delivery/YYYYMMDD/PROJECTCODE/... (e.g. delivery/20071215/GB07-05 for a delivery of GB07-05 created on 15/Dec/2007).
Necessary comments to make in the readme file
- Update anything marked TODO in the template
- Appropriate pixel size
- Appropriate bands for the sensor
- Comments on the quality of the data (accuracy vs vectors, any bad bands, etc) and any specific problems encountered
- Include a tested example command to convert the data from level 1 to level 3
- Ensure the text file is in Windows format (run unix2dos on it if necessary)
- (list of other things to change)
Verification
Once a dataset has been prepared for burning and delivery, a second person should go over it and:
- Check against the logsheet that all data that should be present is.
- Check for typos, etc in the documentation.
- Ensure the readme and other text files are Windows compatible (run unix2dos ReadMe.txt)
- Test out the level 3 processing command for one or more of the level 1 files (definitely one per sensor).
- All level 1 files should be looked at visually (ideally in all bands, though this is only practical for ATM and casi).
Final steps
Burning the data
- create an iso image with mkisofs -R -udf -verbose -o /tmp/dvd.iso -V <PROJECTCODE-JULIANDAY> <delivery_directory>
- test the iso with sudo mount -o ro,loop /tmp/dvd.iso /mnt/tmp - mounts to /mnt/tmp, go look at it, then unmount with sudo umount /mnt/tmp (yes, that is umount not unmount)
- if it's ok, burn to CD/DVD with sudo cdrecord dev=/dev/dvdwriter -sao fs=100m driveropts=burnfree -v /tmp/dvd.iso
- clean up with rm /tmp/dvd.iso
- check the dvd on another machine (ideally Windows)
Lightscribe
- open the CD template from ~arsf/arsf_data/in_progress/2007/delivery/cd_covers/arsf_cd_label_gimp_editable.xcf in gimp
- click on the text button in the toolbox, then click the GB... text and edit to reflect the correct project code
- save as a .bmp file somewhere, e.g. ~/ipy0708214ef.bmp
- on the lightscribe machine (currently pmpc974), run 4L-cli print /dev/hdb ~/ipy0708214ef.bmp
If the drive seems wrong, try 4L-cli enumerate to list attached lightscribe compatible drives.
Preparing hard disks for delivery
You will need to have root permissions before you start.
To create a partition:
Unmount disk run dmesg to find device name (listed at the bottom if just plugged in)
run fdisk /dev/device name (probably sdb)
enter 'p' to print partition table and check you have selected the correct disk
enter 'd' to delete the current partition
enter 'n' to create a new partition
enter 'p' to make new partition the primary partition
enter 'p' to print new partition table – if all seems fine enter 'w' to write
To format the disk:
ensure disk is unmounted again
to be on the safe side, run dmesg again to make sure device name hasn't changed
run mke2fs -j /dev/partition (probably sdb1)
Change permissions:
make writable for everyone – chmod a+rwx /media/disk
Finalising hard disk
Set permissions and owner:
chmod a+rX,a-w -R .
chown root.root -R .
Cover letter
There should be a cover letter with all deliveries. Templates can be found in ~arsf/arsf_data/in_progress/YYYY/delivery/
Trac and website updating
- Add a comment on the trac ticket for this project that this data has been delivered (describe what was sent and when).
- Also add a quicklook to the ticket.
- Update the status database to reflect the delivered data (http://www.npm.ac.uk/rsg/projects/arsf/status/addflight/editflight.php)
Email the PI
- email them that you're putting the disk in the post and ask for confirmation of receipt