Changes between Version 149 and Version 150 of Procedures/NewDataArrival


Ignore:
Timestamp:
Jun 22, 2011, 3:03:54 PM (13 years ago)
Author:
knpa
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Procedures/NewDataArrival

    v149 v150  
    5656Check the filesizes of all data files (Eagle, Hawk, ATM, CASI) to make sure none are zero bytes (or obviously broken in some way).
    5757
     58= Move to permanent PML data storage =
     59
     60Move to appropriate location in the repository (~arsf/arsf_data/2009/flight_data/...)
     61  * ensure the project directory names conform to the standard - '''PROJECTCODE-YYYY_JJJxx_SITENAME''', e.g. ''GB07_07-2007_102a_Inverclyde'', ''boresight-2007_198'', etc
    5862
    5963= Tickets and tracking =
     
    134138}}}
    135139
    136 = Move to permanent PML data storage =
    137 
    138 Move to appropriate location in the repository (~arsf/arsf_data/2009/flight_data/...)
    139   * ensure the project directory names conform to the standard - '''PROJECTCODE-YYYY_JJJxx_SITENAME''', e.g. ''GB07_07-2007_102a_Inverclyde'', ''boresight-2007_198'', etc
    140 
    141140= Create subsidiary files =
    142141