Changes between Version 157 and Version 158 of Procedures/NewDataArrival


Ignore:
Timestamp:
Aug 24, 2011, 11:09:35 AM (13 years ago)
Author:
knpa
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Procedures/NewDataArrival

    v157 v158  
    4545 * Look at the logsheet and verify that we have copies of all relevant data mentioned there.
    4646   * In some cases, the flight crew may fly two projects back-to-back but enter all the data onto a single logsheet.  If so, you may need to split the project directory into two, particularly if there's a large time gap (navigation needs separate processing) or the PIs are different (different delivery addresses/tracking).  If you do need to split a project, ensure both copies have copies of common files (logsheets, rinex, etc), but that non-common files are not duplicated (ie. don't include hawk data for part 1 in part 2..).  Also note in the ticket what was done for tracking purposes.
     47 * Check the filesizes of all data files (Eagle, Hawk, ATM, CASI) to make sure none are zero bytes (or obviously broken in some way).
    4748 * Verify the details on the logsheet (esp. PI) by calling/emailing ARSF-Ops (probably Gary) - the application form and logsheet are not reliable enough, nor do they track any changes in PI over the lifetime of the application. Get the alpha grading as well.
    48  * Check the filesizes of all data files (Eagle, Hawk, ATM, CASI) to make sure none are zero bytes (or obviously broken in some way).
     49
    4950
    5051== Move to permanent PML data storage ==