Changes between Version 91 and Version 92 of Procedures/NewDataArrival
- Timestamp:
- Sep 30, 2009, 3:05:59 PM (15 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Procedures/NewDataArrival
v91 v92 88 88 * In some cases, the flight crew may fly two projects back-to-back but enter all the data onto a single logsheet. If so, you may need to split the project directory into two, particularly if there's a large time gap (navigation needs separate processing) or the PIs are different (different delivery addresses/tracking). If you do need to split a project, ensure both copies have copies of common files (logsheets, rinex, etc), but that non-common files are not duplicated (ie. don't include hawk data for part 1 in part 2..). Also note in the ticket what was done for tracking purposes. 89 89 90 Verify the details on the logsheet (esp. PI) are correct by cross-referencing against the ARSF application form. If we do not have the application, call Kidlingtonto verify.90 Verify the details on the logsheet (esp. PI) are correct by cross-referencing against the ARSF application form. If we do not have the application, call Gloucester to verify. 91 91 92 92 Check the filesizes of all data files (Eagle, Hawk, ATM, CASI) to make sure none are zero bytes (or obviously broken in some way).