Changes between Version 2 and Version 3 of Procedures/NewSeason


Ignore:
Timestamp:
Mar 16, 2011, 10:06:10 AM (14 years ago)
Author:
mggr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Procedures/NewSeason

    v2 v3  
    11= Jobs to do before a new flight season starts =
     2
     3Operational manager should ensure all of these actions are completed prior to starting processing a new flight season.
     4
     5== ARSF-DAN software / configuration updates ==
     6
     7This section lists all the necessary adjustments that must be made to ensure processing operates correctly.
     8
     9Update or create:
     10 1. lever arm file
     11 1. boresight file (~arsf/usr/share/boresight_values.csv)
     12 1. hyperspectral calibration files
     13   * ~arsf/usr/share/calibration_table.csv
     14   * ~arsf/calibration/YEAR/{eagle|hawk}/
     15 1. hyperspectral sample scripts (~arsf/sample_scripts/YEAR)
     16 1. LIDAR intensity-based range correction file
     17   * ~arsf/usr/share/*IBRC* ?
     18   * ~arsf/calibration/lidar/YYYYMMDD
     19 1. RCD calibration files
     20   * ~arsf/calibration/YEAR/rcd
    221
    322== Lever arms ==
     
    1534These values should be recorded at:
    1635 * [wiki:Processing/LeverArmOffset]
     36 * ARSF DAN filesystem:
    1737
    1838== Hyperspectral ==
     
    2242(explanation + insert link to boresight doc here)
    2343
    24 Results should be recorded at [wiki:Processing/BoresightCalibration]
     44Results should be recorded at [wiki:Processing/BoresightCalibration] and the
    2545
    2646=== Radiometric and spectral calibration ===