Changes between Version 1 and Version 2 of Procedures/installation_summary_2023


Ignore:
Timestamp:
Jan 30, 2024, 3:24:29 PM (10 months ago)
Author:
wja
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Procedures/installation_summary_2023

    v1 v2  
    1 = Title =
     1= 2023 Installations =
    22
    3 text
     3The 2023 campaign saw four differnt configorations of instruments on board the VP-FBL Twin Otter in Italy, UK and Canada.
     4
     5= Instrument Orientations =
     6
     7'''Note:''' I believe that the IMU being "backwards" is the way our processing systems expect it.
     8
     9||Installation||Julian Range||IMU||Owl||Fenix1k||Ibis||PhaseOne||
     10||Italy 1||143 - 152||Backwards||Backwards||Backwards||Forwards||Forwards||
     11||Italy 2|| 176 - 183||Backwards||Backwards||Backwards||Forwards||Forwards||
     12||UK||190 - 200||Forwards||Not Installed||Backwards||Forwards||Forwards||
     13||Canada||226-235||Forwards||Forwards||Backwards||Forwards||Forwards||
     14
     15
     16The following should outline the data from which instruments which requires across-sample flipping in order to map.
     17
     18||Installation||Julian Range||Owl||Fenix1k||Ibis||
     19||Italy 1||143 - 152||||||flip||
     20||Italy 2|| 176 - 183||||||flip||
     21||UK||190 - 200||||flip||||
     22||Canada||226-235||||flip||||
     23
     24= Boresight Values =
     25
     26||Installation||Julian Range||Owl||Fenix1k||Ibis||
     27