Version 158 (modified by stgo, 11 years ago) (diff)

--

Hyperspectral reprocessing

Procedural list when reprocessing the 2009 hyperspectral data:

  1. 2009 projects do not have the flight data location filled in in the database, so go to the edit flight page and add the path to the data. This is the 'data location' box and should be filled in with the path like '/users/rsg/arsf/arsf_data/2009/flight_data/'. DO NOT use the path with the server name (e.g. /data/sibyuan5/...). So for example, Day 75b 2009 would have: /users/rsg/arsf/arsf_data/2009/flight_data/uk/GB08_08-2009_075b_Wytham_Woods. You should be able to run projdir 75b 2009 from the command line to get this path (change the julian day for your project). Also check the julian Day in the database is 3 digits long, ie. 075 not 75.
  2. We need to redo the navigation processing ensuring that we do the basestation ppp processing. This is the APPLANIX navigation data NOT the ipas_honeywell.
    1. You should use POSPAC and grafnav to do the navigation processing not POSGNSS - there are instructions on the applanix processing page on how to do this.
    2. Be careful not to overwrite the original navigation data when copying back onto the repository. Currently the original 2009 data should be in posatt/applanix_litton/original_2009_processing with the new data in the usual posatt/applanix_litton directory
  3. The config file should have the scts already in there. You will need to change the paths for certain variables as the data has been moved since the config was set up.
  4. Processing is in slow mode with all bands - but still check the tifs before making the delivery as the new navigation file may have effected the data.
  5. If happy that the tifs are correct (no wobbles, all data line up well) then make the delivery as normal
  6. Remove entries in the readme for h133xx1b_mask-badpixelmethod.bil and h133xx1b_mask-badpixelmethod.bil.hdr as they aren't created for 2009 flights.
  7. Get someone else to check the delivery as normal.
  8. CURRENT PLAN - EDIT THIS WHEN FINALISED: Contact the original PI as the data gets delivery checked, if they would like a redelivery then send it else archive it. benj to write PI email template.

Projects prepared and progress

Year Day Site Processor Delivery checker Notes
2009 68 Wytham Woods Stgo Nav data can't be processed
2009 75a Dennys Wood Stgo Remove references to badpixelmethod files from readme.
2009 75b Wytham Woods Stgo check_apl_command fals with lots of files not being found.
2009 77 Lake Vrynwy Tipo
2009 78a Delamere Tipo Stgo Band 232 in every hawk line has a huge overflow. (Dropped?) Might need to be mentioned in readme.
2009 78b Eaves Wood Tipo Stgo Band 232 problem again on hawk.
2009 78c Leighton Leven Esthwaite Tipo
2009 88 Esthwaite Leven Stgo LiDAR only
2009 91 Fiskerton Barlings Stgo LiDAR only
2009 92 Capel Dewi Stgo Nav data only, no hyperspectral or LiDAR
2009 132a West Coast Stgo Ready for delivery?
2009 132b West Coast Stgo Ready for delivery?
2009 132c West Coast Stgo Ready for delivery?
2009 132d West Coast Stgo Ready for delivery check.
2009 132e West Coast Tipo Stgo Readme has extra lines, Band 232 issue and a large underflow in hawk 2 should be mentioned in readme
2009 132f West Coast Tipo Stgo Ready for delivery?
2009 132g West Coast Tipo Stgo Checking
2009 152a Borth Bog Tipo Ready for delivery check.
2009 152b Pitlocry Stgo Ready for delivery?
2009 153a Ayrshire Coalfields Tipo Ready for delivery check.
2009 153b Ayrshire Coalfields Tipo Ready for delivery check.
2009 153c Ayrshire Coalfields Tipo Ready for delivery check.
2009 154a Wytham Woods Stgo Correcting SCTs
2009 154b Oxford Parks Stgo DEM name doesn't match the one in the config file - double check it's the correct one.
2009 180b Wytham Woods Tipo Ready for delivery check.
2009 182 Bleaklow Stgo Ready for delivery?
2009 191 Inverclyde Tipo
2009 194 Bleaklow Stgo
2009 215 Helheim Tipo Ready for delivery check.
2009 217 Russell Glacier Stgo nav data needs looking at again.
2009 218 Helheim Tipo Ready for delivery check.
2009 219 Helheim Tipo Ready for delivery check.
2009 222 Vatna Tipo Ready for delivery check.
2009 224a Vatna_V1 Tipo Ready for delivery check.
2009 224b Vatna_01H Tipo Ready for delivery check.
2009 239a Swiss Alps Tipo Ready for delivery check.
2009 239b Swiss Alps Tipo Ready for delivery check.
2009 252b Whytham Woods Tipo Ready for delivery check.
2009 268b Whytham Woods Tipo Ready for delivery check.
2009 268c Denny Wood Stgo
2009 277 Inverclyde Stgo
2009 278a Eaves Wood Tipo Ready for delivery check.
2009 278b Leighton Moss Tipo Ready for delivery check.
2009 278c Leighton Moss Tipo
2009 280a Bleaklow Tipo
2009 280b Freiston Shore
2009 281 Delamere
2009 285 Lake Vrynwy
2009 298 Afar Mid
2009 299 Afar North
2009 300a Afar Noth
2009 300b Afar South
2009 301 Afar North
2009 327 Cumbria Floods
2009 331 Abernethy
2009 334 Cumbria Floods

Projects completed

2009

Year Day Site Processor

2010 & Later

All done!

Projects Outstanding

Everything else!