Version 200 (modified by stgo, 11 years ago) (diff) |
---|
Hyperspectral reprocessing
Procedural list when reprocessing the 2009 hyperspectral data:
- 2009 projects do not have the flight data location filled in in the database, so go to the edit flight page and add the path to the data. This is the 'data location' box and should be filled in with the path like '/users/rsg/arsf/arsf_data/2009/flight_data/'. DO NOT use the path with the server name (e.g. /data/sibyuan5/...). So for example, Day 75b 2009 would have: /users/rsg/arsf/arsf_data/2009/flight_data/uk/GB08_08-2009_075b_Wytham_Woods. You should be able to run projdir 75b 2009 from the command line to get this path (change the julian day for your project). Also check the julian Day in the database is 3 digits long, ie. 075 not 75.
- We need to redo the navigation processing ensuring that we do the basestation ppp processing. This is the APPLANIX navigation data NOT the ipas_honeywell.
- You should use POSPAC and grafnav to do the navigation processing not POSGNSS - there are instructions on the applanix processing page on how to do this.
- Be careful not to overwrite the original navigation data when copying back onto the repository. Currently the original 2009 data should be in posatt/applanix_litton/original_2009_processing with the new data in the usual posatt/applanix_litton directory
- The config file should have the scts already in there. You will need to change the paths for certain variables as the data has been moved since the config was set up.
- Processing is in slow mode with all bands - but still check the tifs before making the delivery as the new navigation file may have effected the data.
- If happy that the tifs are correct (no wobbles, all data line up well) then make the delivery as normal
- Check the old delivery's readme for any data quality remarks that need to be included in the new readme.
- Remove entries in the readme for h133xx1b_mask-badpixelmethod.bil and h133xx1b_mask-badpixelmethod.bil.hdr as they aren't created for 2009 flights.
- Get someone else to check the delivery as normal.
- CURRENT PLAN - EDIT THIS WHEN FINALISED: Contact the original PI as the data gets delivery checked, if they would like a redelivery then send it else archive it. benj to write PI email template.
Projects prepared and progress
Year | Day | Site | Processor | Delivery checker | Notes |
2009 | 68 | Wytham Woods | Stgo | Nav data can't be processed | |
2009 | 75a | Dennys Wood | Stgo | Remove references to badpixelmethod files from readme. | |
2009 | 75b | Wytham Woods | Stgo | check_apl_command fals with lots of files not being found. | |
2009 | 77 | Lake Vrynwy | Tipo | "Time goes backwards in navigation". Mark to fix script. | |
2009 | 78a | Delamere | Tipo | Stgo | Ready to redeliver. |
2009 | 78b | Eaves Wood | Tipo | Stgo | Ready to redeliver. |
2009 | 78c | Leighton Leven Esthwaite | Tipo | ||
2009 | 88 | Esthwaite Leven | Stgo | LiDAR only | |
2009 | 91 | Fiskerton Barlings | Stgo | LiDAR only | |
2009 | 92 | Capel Dewi | Stgo | Nav data only, no hyperspectral or LiDAR | |
2009 | 132a | West Coast | Stgo | Tipo | Ready to redeliver. |
2009 | 132b | West Coast | Stgo | Tipo | Ready to redeliver. |
2009 | 132c | West Coast | Stgo | Tipo | Ready to redeliver. |
2009 | 132d | West Coast | Stgo | Tipo | Ready to redeliver. |
2009 | 132e | West Coast | Tipo | Stgo | Ready to rediliver. |
2009 | 132f | West Coast | Tipo | Stgo | Ready to redeliver. |
2009 | 132g | West Coast | Tipo | Stgo | Ready to redeliver. |
2009 | 152a | Borth Bog | Tipo | Stgo | Ready to redeliver. |
2009 | 152b | Pitlocry | Stgo | Tipo | Ready to redeliver. |
2009 | 153a | Ayrshire Coalfields | Tipo | Stgo | Ready to redeliver. |
2009 | 153b | Ayrshire Coalfields | Tipo | Stgo | Ready to redeliver. |
2009 | 153c | Ayrshire Coalfields | Tipo | Stgo | Ready to redeliver. |
2009 | 154a | Wytham Woods | Stgo | Missing data quality comments from old processing. | |
2009 | 154b | Oxford Parks | Stgo | Ready to redeliver. | |
2009 | 180b | Wytham Woods | Tipo | Checking, there are more lines than are accounted for in the logsheet. | |
2009 | 182 | Bleaklow | Stgo | Tipo | Ready to redeliver. |
2009 | 191 | Inverclyde | Tipo | Ready for delivery check. | |
2009 | 194 | Bleaklow | Stgo | Ready for delivery check. | |
2009 | 215 | Helheim | Tipo | Ready for delivery check. | |
2009 | 217 | Russell Glacier | Stgo | nav data needs looking at again. | |
2009 | 218 | Helheim | Tipo | Ready for delivery check. | |
2009 | 219 | Helheim | Tipo | Ready for delivery check. | |
2009 | 222 | Vatna | Tipo | Ready for delivery check. | |
2009 | 224a | Vatna_V1 | Tipo | Ready for delivery check. | |
2009 | 224b | Vatna_01H | Tipo | Ready for delivery check. | |
2009 | 239a | Swiss Alps | Tipo | Ready for delivery check. | |
2009 | 239b | Swiss Alps | Tipo | Ready for delivery check. | |
2009 | 252b | Whytham Woods | Tipo | Ready for delivery check. | |
2009 | 268b | Whytham Woods | Tipo | Ready for delivery check. | |
2009 | 268c | Denny Wood | Stgo | ||
2009 | 277 | Inverclyde | Stgo | ||
2009 | 278a | Eaves Wood | Tipo | Ready for delivery check. | |
2009 | 278b | Leighton Moss | Tipo | Ready for delivery check. | |
2009 | 278c | Leighton Moss | Tipo | Nav doesn't cover line 1? | |
2009 | 280a | Bleaklow | Tipo | ||
2009 | 280b | Freiston Shore | Tipo | ||
2009 | 281 | Delamere | Tipo | Ready for delivery check. | |
2009 | 285 | Lake Vrynwy | |||
2009 | 298 | Afar Mid | |||
2009 | 299 | Afar North | |||
2009 | 300a | Afar Noth | |||
2009 | 300b | Afar South | |||
2009 | 301 | Afar North | |||
2009 | 327 | Cumbria Floods | |||
2009 | 331 | Abernethy | |||
2009 | 334 | Cumbria Floods |
Projects completed
2009
Year | Day | Site | Processor |
2010 & Later
All done!
Projects Outstanding
Everything else!