Hyperspectral reprocessing
Procedural list when reprocessing the 2009 hyperspectral data:
- 2009 projects do not have the flight data location filled in in the database, so go to the edit flight page and add the path to the data. This is the 'data location' box and should be filled in with the path like '/users/rsg/arsf/arsf_data/2009/flight_data/'. DO NOT use the path with the server name (e.g. /data/sibyuan5/...). So for example, Day 75b 2009 would have: /users/rsg/arsf/arsf_data/2009/flight_data/uk/GB08_08-2009_075b_Wytham_Woods. You should be able to run projdir 75b 2009 from the command line to get this path (change the julian day for your project). Also check the julian Day in the database is 3 digits long, ie. 075 not 75.
- We need to redo the navigation processing ensuring that we do the basestation ppp processing. This is the APPLANIX navigation data NOT the ipas_honeywell.
- You should use POSPAC and grafnav to do the navigation processing not POSGNSS - there are instructions on the applanix processing page on how to do this.
- Be careful not to overwrite the original navigation data when copying back onto the repository. Currently the original 2009 data should be in posatt/applanix_litton/original_2009_processing with the new data in the usual posatt/applanix_litton directory
- The config file should have the scts already in there. You will need to change the paths for certain variables as the data has been moved since the config was set up.
- Processing is in slow mode with all bands - but still check the tifs before making the delivery as the new navigation file may have effected the data.
- If happy that the tifs are correct (no wobbles, all data line up well) then make the delivery as normal
- Check the old delivery's readme for any data quality remarks that need to be included in the new readme.
- Remove entries in the readme for h133xx1b_mask-badpixelmethod.bil and h133xx1b_mask-badpixelmethod.bil.hdr as they aren't created for 2009 flights.
- Get someone else to check the delivery as normal.
- CURRENT PLAN - EDIT THIS WHEN FINALISED: Contact the original PI as the data gets delivery checked, if they would like a redelivery then send it else archive it. benj to write PI email template.
Projects prepared and progress
2008
Year | Day | Site | Processor | Delivery checker | Notes
|
2008 | 026b | Alem Tena (ABC) | Tipo | |
|
2009
Year | Day | Site | Processor | Delivery checker | Notes
|
2009 | 68 | Wytham Woods | Stgo | | Nav data can't be processed
|
2009 | 75a | Dennys Wood | Stgo | Tipo | Ready for redelivery.
|
2009 | 75b | Wytham Woods | Stgo | Tipo | Fixed apl, ready for check
|
2009 | 77 | Lake Vrynwy | Tipo | | "Time goes backwards in navigation". Mark to fix script.
|
2009 | 78a | Delamere | Tipo | Stgo | Ready to redeliver.
|
2009 | 78b | Eaves Wood | Tipo | Stgo | Ready to redeliver.
|
2009 | 78c | Leighton Leven Esthwaite | Tipo | | Lines 4 & 6 don't align with the others.
|
2009 | 88 | Esthwaite Leven | Stgo | | LiDAR only
|
2009 | 91 | Fiskerton Barlings | Stgo | | LiDAR only
|
2009 | 92 | Capel Dewi | Stgo | | Nav data only, no hyperspectral or LiDAR
|
2009 | 132a | West Coast | Stgo | Tipo | Ready to redeliver.
|
2009 | 132b | West Coast | Stgo | Tipo | Ready to redeliver.
|
2009 | 132c | West Coast | Stgo | Tipo | Ready to redeliver.
|
2009 | 132d | West Coast | Stgo | Tipo | Ready to redeliver.
|
2009 | 132e | West Coast | Tipo | Stgo | Ready to rediliver.
|
2009 | 132f | West Coast | Tipo | Stgo | Ready to redeliver.
|
2009 | 132g | West Coast | Tipo | Stgo | Ready to redeliver.
|
2009 | 152a | Borth Bog | Tipo | Stgo | Ready to redeliver.
|
2009 | 152b | Pitlocry | Stgo | Tipo | Ready to redeliver.
|
2009 | 153a | Ayrshire Coalfields | Tipo | Stgo | Ready to redeliver.
|
2009 | 153b | Ayrshire Coalfields | Tipo | Stgo | Ready to redeliver.
|
2009 | 153c | Ayrshire Coalfields | Tipo | Stgo | Ready to redeliver.
|
2009 | 154a | Wytham Woods | Stgo | Tipo | Ready to redeliver.
|
2009 | 154b | Oxford Parks | Stgo | Tipo | Ready to redeliver.
|
2009 | 180b | Wytham Woods | Tipo | Stgo | Ready to redeliver.
|
2009 | 182 | Bleaklow | Stgo | Tipo | Ready to redeliver.
|
2009 | 191 | Inverclyde | Tipo | Stgo | Ready to redeliver.
|
2009 | 194 | Bleaklow | Stgo | Tipo | SCTs could do with double checking - road doesn't line up on some lines.
|
2009 | 215 | Helheim | Tipo | Stgo | Ready to redeliver.
|
2009 | 217 | Russell Glacier | Stgo | | nav data needs looking at again.
|
2009 | 218 | Helheim | Tipo | Stgo | Ready to redeliver.
|
2009 | 219 | Helheim | Tipo | Stgo | Ready to redeliver.
|
2009 | 222 | Vatna | Tipo | Stgo | Ready to redeliver.
|
2009 | 224a | Vatna_V1 | Tipo | Stgo | Ready to redeliver
|
2009 | 224b | Vatna_01H | Tipo | Stgo | Ready to redeliver.
|
2009 | 239a | Swiss Alps | Tipo | Stgo | Ready to redeliver.
|
2009 | 239b | Swiss Alps | Tipo | Stgo | Ready to redeliver.
|
2009 | 252b | Whytham Woods | Tipo | Stgo | Ready to redeliver.
|
2009 | 268b | Whytham Woods | Tipo | Stgo | Ready to redeliver.
|
2009 | 268c | Denny Wood | Stgo | Tipo | Ready to redeliver.
|
2009 | 277 | Inverclyde | Stgo | |
|
2009 | 278a | Eaves Wood | Tipo | Stgo | There are 12 eagle lines, but only 11 noted on the logsheet? Otherwise ready to redeliver.
|
2009 | 278b | Leighton Moss | Tipo | Stgo | Ready to redeliver.
|
2009 | 278c | Leighton Moss | Tipo | | Nav doesn't cover line 1?
|
2009 | 280a | Bleaklow | Tipo | Stgo | Noted underflow in readme, Ready for delivery.
|
2009 | 280b | Freiston Shore | Tipo | Stgo | Check_apl fails on dem name.
|
2009 | 281 | Delamere | Tipo | Stgo | Check apl can't find nav data.
|
2009 | 285 | Lake Vrynwy | Tipo | |
|
2009 | 298 | Afar Mid | Tipo | Stgo | Ready to redeliver.
|
2009 | 299 | Afar North | Tipo | | Ready for delivery check.
|
2009 | 300a | Afar Noth | Tipo | | line 1 has problems with its missing frames being missing.
|
2009 | 300b | Afar South | Tipo | | Nav doesn't cover every line?
|
2009 | 301 | Afar North | | | LiDAR only.
|
2009 | 327 | Cumbria Floods | | | LiDAR only.
|
2009 | 331 | Abernethy | | | LiDAR only.
|
2009 | 334 | Cumbria Floods | Tipo | | Ready for delivery check.
|
Projects completed
2009
2010 & Later
All done!
Projects Outstanding
Everything else!