Version 340 (modified by stgo, 10 years ago) (diff)

--

Hyperspectral reprocessing

Procedural list when reprocessing the 2009 hyperspectral data:

  1. 2009 projects do not have the flight data location filled in in the database, so go to the edit flight page and add the path to the data. This is the 'data location' box and should be filled in with the path like '/users/rsg/arsf/arsf_data/2009/flight_data/'. DO NOT use the path with the server name (e.g. /data/sibyuan5/...). So for example, Day 75b 2009 would have: /users/rsg/arsf/arsf_data/2009/flight_data/uk/GB08_08-2009_075b_Wytham_Woods. You should be able to run projdir 75b 2009 from the command line to get this path (change the julian day for your project). Also check the julian Day in the database is 3 digits long, ie. 075 not 75.
  2. We need to redo the navigation processing ensuring that we do the basestation ppp processing. This is the APPLANIX navigation data NOT the ipas_honeywell.
    1. You should use POSPAC and grafnav to do the navigation processing not POSGNSS - there are instructions on the applanix processing page on how to do this.
    2. Be careful not to overwrite the original navigation data when copying back onto the repository. Currently the original 2009 data should be in posatt/applanix_litton/original_2009_processing with the new data in the usual posatt/applanix_litton directory
  3. The config file should have the scts already in there. You will need to change the paths for certain variables as the data has been moved since the config was set up.
  4. Processing is in slow mode with all bands - but still check the tifs before making the delivery as the new navigation file may have effected the data.
  5. If happy that the tifs are correct (no wobbles, all data line up well) then make the delivery as normal
  6. Check the old delivery's readme for any data quality remarks that need to be included in the new readme.
  7. Remove entries in the readme for h133xx1b_mask-badpixelmethod.bil and h133xx1b_mask-badpixelmethod.bil.hdr as they aren't created for 2009 flights.
  8. Get someone else to check the delivery as normal.
  9. CURRENT PLAN - EDIT THIS WHEN FINALISED: Contact the original PI as the data gets delivery checked, if they would like a redelivery then send it else archive it. benj to write PI email template.

Projects prepared and progress

2007

Year Day Site Processor Delivery checker Hyperspectral ATM CASI Notes
2007 261 Plymouth Tipo None

2008

Year Day Site Processor Delivery checker Notes
2008 026b Alem Tena (ABC) Tipo Stgo Added Fodis and updated readme. Ready for delivery check.
2008 029 Lake Tana Box1 EW Stgo
2008 030 Lake Tana Box2 NS Tipo Ready for delivery check.
2008 031 Dirfarsa Tipo Ready for delivery check.
2008 034 Mojo Stgo
2008 035a Konso Tipo Ready for delivery check.
2008 035b Rift South Tipo Ready for delivery check.
2008 036 Rift North Tipo Ready for delivery check.
2008 044 Hayton Tipo Ready for delivery check.
2008 049a 4 Welsh sites Stgo
2008 049b Wytham Woods Stgo
2008 128a Delamere Wood Stgo

2009

Year Day Site Processor Delivery checker Notes
2009 68 Wytham Woods Stgo Nav data can't be processed
2009 75a Dennys Wood Stgo Tipo Ready for redelivery.
2009 75b Wytham Woods Stgo Tipo Fixed apl, ready for check
2009 77 Lake Vrynwy Tipo "Time goes backwards in navigation". Mark to fix script.
2009 78a Delamere Tipo Stgo Ready to redeliver.
2009 78b Eaves Wood Tipo Stgo Ready to redeliver.
2009 78c Leighton Leven Esthwaite Tipo Stgo Seeking next map dem in apl commands
2009 88 Esthwaite Leven Stgo LiDAR only
2009 91 Fiskerton Barlings Stgo LiDAR only
2009 92 Capel Dewi Stgo Nav data only, no hyperspectral or LiDAR
2009 132a West Coast Stgo Tipo Ready to redeliver.
2009 132b West Coast Stgo Tipo Ready to redeliver.
2009 132c West Coast Stgo Tipo Ready to redeliver.
2009 132d West Coast Stgo Tipo Ready to redeliver.
2009 132e West Coast Tipo Stgo Ready to rediliver.
2009 132f West Coast Tipo Stgo Ready to redeliver.
2009 132g West Coast Tipo Stgo Ready to redeliver.
2009 152a Borth Bog Tipo Stgo Ready to redeliver.
2009 152b Pitlocry Stgo Tipo Ready to redeliver.
2009 153a Ayrshire Coalfields Tipo Stgo Ready to redeliver.
2009 153b Ayrshire Coalfields Tipo Stgo Ready to redeliver.
2009 153c Ayrshire Coalfields Tipo Stgo Ready to redeliver.
2009 154a Wytham Woods Stgo Tipo Delivered
2009 154b Oxford Parks Stgo Tipo Ready to redeliver.
2009 180b Wytham Woods Tipo Stgo Delivered
2009 182 Bleaklow Stgo Tipo Ready to redeliver.
2009 191 Inverclyde Tipo Stgo Ready to redeliver.
2009 194 Bleaklow Stgo Tipo SCTs could do with double checking - road doesn't line up on some lines.
2009 215 Helheim Tipo Stgo Ready to redeliver.
2009 217 Russell Glacier Stgo nav data needs looking at again.
2009 218 Helheim Tipo Stgo Ready to redeliver.
2009 219 Helheim Tipo Stgo Ready to redeliver.
2009 222 Vatna Tipo Stgo Ready to redeliver.
2009 224a Vatna_V1 Tipo Stgo Ready to redeliver
2009 224b Vatna_01H Tipo Stgo Ready to redeliver.
2009 239a Swiss Alps Tipo Stgo Ready to redeliver.
2009 239b Swiss Alps Tipo Stgo Ready to redeliver.
2009 252b Whytham Woods Tipo Stgo Delivered.
2009 268b Whytham Woods Tipo Stgo Delivered.
2009 268c Denny Wood Stgo Tipo Ready to redeliver.
2009 277 Inverclyde Stgo Ready for delivery check.
2009 278a Eaves Wood Tipo Stgo Ready for delivery check.
2009 278b Leighton Moss Tipo Stgo Ready to redeliver.
2009 278c Leighton Moss Tipo Nav doesn't cover line 1?
2009 280a Bleaklow Tipo Stgo Noted underflow in readme, Ready for delivery.
2009 280b Freiston Shore Tipo Stgo Fixed dem reference in config, ready for delivery check.
2009 281 Delamere Tipo Stgo Check apl can't find nav data.
2009 285 Lake Vrynwy Tipo Stgo Ready to redeliver.
2009 298 Afar Mid Tipo Stgo Ready to redeliver.
2009 299 Afar North Tipo Stgo Ready to redeliver.
2009 300a Afar Noth Tipo line 1 has problems with its missing frames being missing.
2009 300b Afar South Tipo Nav doesn't cover every line?
2009 301 Afar North LiDAR only.
2009 327 Cumbria Floods LiDAR only.
2009 331 Abernethy LiDAR only.
2009 334 Cumbria Floods Tipo stgo Ready to redeliver.

Projects completed

2009

Year Day Site Processor Delivery Date
2009 154a Wytham Woods Stgo 23/10/2013
2009 180b Wytham Woods Tipo 23/10/2013
2009 252b Wytham Woods Tipo 23/10/2013
2009 268b Wytham Woods Tipo 23/10/2013

2010 & Later

All done!

Projects Outstanding

Everything else!