Version 39 (modified by knpa, 11 years ago) (diff) |
---|
Hyperspectral reprocessing
Procedural list when reprocessing the 2009 hyperspectral data:
- 2009 projects do not have the flight data location filled in in the database, so go to the edit flight page and add the path to the data. This is the 'data location' box and should be filled in with the path like '/users/rsg/arsf/arsf_data/2009/flight_data/'. DO NOT use the path with the server name (e.g. /data/sibyuan5/...). So for example, Day 75b 2009 would have: /users/rsg/arsf/arsf_data/2009/flight_data/uk/GB08_08-2009_075b_Wytham_Woods. You should be able to run projdir 75b 2009 from the command line to get this path (change the julian day for your project).
- We need to redo the navigation processing ensuring that we do the basestation ppp processing. This is the APPLANIX navigation data NOT the ipas_honeywell.
- You should use POSPAC and grafnav to do the navigation processing not POSGNSS - there are instructions on the applanix processing page on how to do this.
- Be careful not to overwrite the original navigation data when copying back onto the repository. Currently the original 2009 data should be in posatt/applanix_litton/original_2009_processing with the new data in the usual posatt/applanix_litton directory
- The config file should have the scts already in there. You will need to change the paths for certain variables as the data has been moved since the config was set up.
- Processing is in slow mode with all bands - but still check the tifs before making the delivery as the new navigation file may have effected the data.
- If happy that the tifs are correct (no wobbles, all data line up well) then make the delivery as normal
- Get someone else to check the delivery as normal but no need to redeliver.
Projects prepared and progress
Year | Day | Site | Processor | Delivery checker | Notes |
2009 | 68 | Wytham Woods | Stgo | Nav data can't be processed | |
2009 | 75a | Dennys Wood | Stgo | Ready for delivery check. | |
2009 | 75b | Wytham Woods | Stgo | Ready for delivery check. | |
2009 | 77 | Lake Vrynwy | Tipo | ||
2009 | 78a | Delamere | Tipo | Ready for delivery check. | |
2009 | 78b | Eaves Wood | Tipo | Ready for delivery check. | |
2009 | 78c | Leighton Leven Esthwaite | Tipo | ||
2009 | 88 | Esthwaite Leven | Stgo | LiDAR only | |
2009 | 91 | Fiskerton Barlings | Stgo | LiDAR only | |
2009 | 92 | Capel Dewi | Stgo | Nav data only, no hyperspectral or LiDAR | |
2009 | 132a | West Coast | Stgo | Ready for delivery check. | |
2009 | 132b | West Coast | Stgo | Hawk line 6 not processing due to autodark error | |
2009 | 132c | West Coast | Stgo | Ready for delivery check. | |
2009 | 132d | West Coast | Stgo | Ready for delivery check. | |
2009 | 132e | West Coast | Tipo | Ready for delivery check. | |
2009 | 132f | West Coast | Tipo | ||
2009 | 132g | West Coast | Tipo | ||
2009 | 152a | Borth Bog | Stgo | ||
2009 | 152b | Pitlocry | Stgo | ||
2009 | 153a | Ayrshire Coalfields | |||
2009 | 153b | Ayrshire Coalfields | |||
2009 | 153c | Ayrshire Coalfields | |||
2009 | 154a | Wytham Woods | Stgo | ||
2009 | 154b | Oxford Parks | |||
2009 | 180b | Wytham Woods | |||
2009 | 182 | Bleaklow | |||
2009 | 191 | Inverclyde | |||
2009 | 194 | Bleaklow | |||
2009 | 268c | Denny Wood |
Projects completed
2009
Year | Day | Site | Processor |
2010 & Later
All done!
Projects Outstanding
Everything else!