Version 56 (modified by knpa, 11 years ago) (diff)

--

Hyperspectral reprocessing

Procedural list when reprocessing the 2009 hyperspectral data:

  1. 2009 projects do not have the flight data location filled in in the database, so go to the edit flight page and add the path to the data. This is the 'data location' box and should be filled in with the path like '/users/rsg/arsf/arsf_data/2009/flight_data/'. DO NOT use the path with the server name (e.g. /data/sibyuan5/...). So for example, Day 75b 2009 would have: /users/rsg/arsf/arsf_data/2009/flight_data/uk/GB08_08-2009_075b_Wytham_Woods. You should be able to run projdir 75b 2009 from the command line to get this path (change the julian day for your project).
  2. We need to redo the navigation processing ensuring that we do the basestation ppp processing. This is the APPLANIX navigation data NOT the ipas_honeywell.
    1. You should use POSPAC and grafnav to do the navigation processing not POSGNSS - there are instructions on the applanix processing page on how to do this.
    2. Be careful not to overwrite the original navigation data when copying back onto the repository. Currently the original 2009 data should be in posatt/applanix_litton/original_2009_processing with the new data in the usual posatt/applanix_litton directory
  3. The config file should have the scts already in there. You will need to change the paths for certain variables as the data has been moved since the config was set up.
  4. Processing is in slow mode with all bands - but still check the tifs before making the delivery as the new navigation file may have effected the data.
  5. If happy that the tifs are correct (no wobbles, all data line up well) then make the delivery as normal
  6. Get someone else to check the delivery as normal but no need to redeliver.

Projects prepared and progress

Year Day Site Processor Delivery checker Notes
2009 68 Wytham Woods Stgo Nav data can't be processed
2009 75a Dennys Wood Stgo Ready for delivery check.
2009 75b Wytham Woods Stgo Ready for delivery check.
2009 77 Lake Vrynwy Tipo
2009 78a Delamere Tipo Ready for delivery check.
2009 78b Eaves Wood Tipo Ready for delivery check.
2009 78c Leighton Leven Esthwaite Tipo
2009 88 Esthwaite Leven Stgo LiDAR only
2009 91 Fiskerton Barlings Stgo LiDAR only
2009 92 Capel Dewi Stgo Nav data only, no hyperspectral or LiDAR
2009 132a West Coast Stgo Ready for delivery check.
2009 132b West Coast Stgo Hawk line 6 not processing due to autodark error
2009 132c West Coast Stgo Ready for delivery check.
2009 132d West Coast Stgo Ready for delivery check.
2009 132e West Coast Tipo Ready for delivery check.
2009 132f West Coast Tipo Ready for delivery check.
2009 132g West Coast Tipo Ready for delivery check.
2009 152a Borth Bog Tipo Ready for delivery check.
2009 152b Pitlocry Stgo Ready for delivery check.
2009 153a Ayrshire Coalfields Tipo Ready for delivery check.
2009 153b Ayrshire Coalfields
2009 153c Ayrshire Coalfields
2009 154a Wytham Woods Stgo Nav resolved
2009 154b Oxford Parks Stgo
2009 180b Wytham Woods
2009 182 Bleaklow
2009 191 Inverclyde
2009 194 Bleaklow
2009 215 Helheim
2009 217 Russell Glacier
2009 218 Helheim
2009 219 Helheim
2009 222 Vatna
2009 224a Vatna_V1
2009 224b Vatna_01H
2009 239a Swiss Alps
2009 239b Swiss Alps
2009 252b Whytham Woods
2009 268c Denny Wood

Projects completed

2009

Year Day Site Processor

2010 & Later

All done!

Projects Outstanding

Everything else!