Version 28 (modified by mark1, 13 years ago) (diff) |
---|
Procedures
These pages document established procedures for processing, data delivery, archiving, etc. Please be aware that these pages may be written in technical language as they are mainly used for documenting internal processing.
Project processing procedure
This page contains links to detailed step-by-step instructions on how to deal with data from arrival to dispatch to the user. Please keep updated. A simplified overview of the procedures can be seen in the flow chart, with the more detailed, technical descriptions below.
Procedure
- Unpacking data
- Processing nav data
- Processing
- Creating a delivery
- Once the delivery has been created, it needs to be delivery checked
- Dispatching to PI
- Tidy the project. Get rid of any unnecessary files and make sure the directory and file names conform to the current standard (use proj_tidy.sh)
- (2010 and earlier) r-syncing from the workspace to the repository
- Archiving at NEODC
Other procedures
Attachments (1)
-
simple_overview.jpeg
(47.1 KB) -
added by mark1 13 years ago.
Simple overview of the procedural chain
Download all attachments as: .zip