7 | | * Open GrafNav and do the PPP processing (see [wiki:Processing/GrafNavProcessing]) |
8 | | * To make sure that files are saved to the correct folder, save the project to posatt/basestation/ppp_result at the start before processing |
9 | | * Download the precise clock and ephemeris data (4th or 5th tab under PPP processing settings) and save to the ppp_result directory |
10 | | * Check Datums in the General tab |
11 | | * Process->PPP |
12 | | * Save the project again. |
13 | | |
14 | | When the solution is available left click the GPS point to query the lat/lon/hei and make a note of it. You will probably need to zoom in substantially. |
15 | | |
16 | | If there are multiple base stations to use for the navigation processing repeat for all base stations. |
| 7 | * Open GrafNav and do the PPP processing: |
| 8 | * To make sure that files are saved to the correct folder, save the project to posatt/basestation/ppp_result at the start before processing - use a filename such as YYYYJJJ_baseppp where YYYY is the year and JJJ is the julian day. |
| 9 | * Add basestation as remote file |
| 10 | * Settings -> load from PPP |
| 11 | * Download the precise clock and ephemeris data (4th or 5th tab under PPP processing settings) and save to the ppp_result directory |
| 12 | * Check Datums in the General tab |
| 13 | * Process->PPP |
| 14 | * Save the project again. |
| 15 | * When the solution is available left click the GPS point to query the lat/lon/hei and make a note of it. You will probably need to zoom in substantially. |
| 16 | * If there are multiple base stations to use for the navigation processing repeat for all base stations. |