Changes between Version 17 and Version 18 of Processing/BasestationVerification


Ignore:
Timestamp:
Oct 1, 2014, 12:28:29 PM (10 years ago)
Author:
tec
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Processing/BasestationVerification

    v17 v18  
    1010 * Add basestation as remote file
    1111 * Settings -> load from PPP
    12  * Download the precise clock and ephemeris data (4th or 5th tab under PPP processing settings) and save to the ppp_result directory (Check the date to make sure the correct day is being downloaded.)
     12 * Download the precise clock and ephemeris data ("Precise" Tab under PPP processing settings) and save to the ppp_result directory (Check the date to make sure the correct day is being downloaded.)
    1313 * Check Datums in the General tab
    1414 * Process->PPP