    77* Open GrafNav and do the PPP processing (see [wiki:Processing/GrafNavProcessing])
     8 * To make sure that files are saved to the correct folder, save the project to posatt/basestation/ppp_result at the start before processing (This needs to be checked that it does save the files in the right place :) )
    89* Add the base station as remote file
    910* Download the precise clock and ephemeris data (4th or 5th tab under PPP processing settings)