Changes between Version 25 and Version 26 of Processing/BoresightCalibration


Ignore:
Timestamp:
Oct 26, 2009, 12:16:45 PM (15 years ago)
Author:
mggr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Processing/BoresightCalibration

    v25 v26  
    77|| '''Period (Julian days)''' || '''ATM'''       || '''CASI'''       ||    '''Eagle'''       ||    '''Hawk'''        ||
    88|| (start of year) - 130      || -               || -                ||      Variable        ||     Variable         ||
    9 || 131 -> ?                   || -               || -                || -0.245 -0.770 0.269  || -0.307 0.203 -0.040  ||
     9|| 131 -> 267                 || -               || -                || -0.245 -0.770 0.269  || -0.307 0.203 -0.040  ||
     10|| 268 ->  ?                  || -               || -                || -0.32 -0.52 0.26     || 0.23 0.27 0.0  ||
    1011
    1112Notes:
    1213
    13  * During the period 001 to 130, there is evidence to suggest that one or both of the sensors was moving and as such, for this period a boresight is essential for each individual flight line.
     14 * During the period 001 to 130, there is evidence to suggest that one or both of the sensors was moving and as such, for this period a individual boresight correction is essential for each individual flight line.
    1415
    1516