Changes between Version 5 and Version 6 of Processing/GrafNavProcessing
- Timestamp:
- Apr 30, 2009, 11:10:05 AM (16 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Processing/GrafNavProcessing
v5 v6 1 == Graf Nav GNSS Processing for IPAS Pro ==1 == Grafnav GNSS Processing for IPAS Pro == 2 2 3 3 Similar to Applanix GNSS processing. (See that wiki page if these notes dont make sense :)) … … 19 19 20 20 If the PPP processing method doesn't work and gives the error "Cannot find epoch ... blah blah blah", then try this: 21 1. Go to "Help" and "About Graf Nav"21 1. Go to "Help" and "About Grafnav" 22 22 1. Click download manufacturer files 23 23 1. Re-try running the PPP 24 24 25 === Exporting Graf Nav Result to POSPAC ===26 It is possible to do the GNSS processing in Graf Nav and then export the result into POSPAC. This saves doing the GNSS processing two times (one for LiDAR IMU and one for Applanix IMU). The version of GrafNav is newer than the POSGNSS version and should be used instead of POSGNSS.25 === Exporting Grafnav Result to POSPAC === 26 It is possible to do the GNSS processing in Grafnav and then export the result into POSPAC. This saves doing the GNSS processing two times (one for LiDAR IMU and one for Applanix IMU). The version of Grafnav is newer than the POSGNSS version and should be used instead of POSGNSS. 27 27 28 When the solution in Graf Nav is ready to be exported, save the project and go into POSGNSS. Open the GrafNav project into POSGNSS, ignore warnings about being an older version. Then click the "combine GNSS" or "combine PPP" button. This will load in the previous solution. This can then be exported to POSProc as per usual. If the "combine" buttons are not highlighted, then you can goto the menu and select combine solutions, select the files and load in the forward and reverse ones.28 When the solution in Grafnav is ready to be exported, save the project and go into POSGNSS. Open the Grafnav project into POSGNSS, ignore warnings about being an older version. Then click the "combine GNSS" or "combine PPP" button. This will load in the previous solution. This can then be exported to POSProc as per usual. If the "combine" buttons are not highlighted, then you can goto the menu and select combine solutions, select the files and load in the forward and reverse ones.