Changes between Version 4 and Version 5 of Processing/LeverArmOffset


Ignore:
Timestamp:
Mar 11, 2008, 10:49:04 AM (17 years ago)
Author:
benj
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Processing/LeverArmOffset

    v4 v5  
    23232006 obs and results as follows:
    2424
    25 11th Mar. 2008: Note that the email below were the numbers as originally received, but calculation of the Gamma angle contains an error - "gam = acos( abs(dz) / dst )" should use asin, not acos. Del and Dst are unaffected. Investigation of this suggests this causes an along-track error of approx. 1.5m in all 2006/2007 delivered data for ATM, which may be partially corrected by boresight correction (since these numbers were computed using the incorrect lever-arm numbers) depending on flight altitude. Other sensors have smaller errors, since the effect of the original calculation error is smaller for the offset angles of these sensors. Correct lever-arm numbers are below for reference, new boresight numbers would need to be computed to use these.
     2511th Mar. 2008: Note that the email below contains the numbers as originally received, but calculation of the Gamma angle contains an error - "gam = acos( abs(dz) / dst )" should use asin, not acos. Del and Dst are unaffected. Investigation of this suggests this causes an along-track error of approx. 1.5m in all 2006/2007 delivered data for ATM, which may be partially corrected by boresight correction (since these numbers were computed using the incorrect lever-arm numbers) depending on flight altitude. Other sensors have smaller errors, since the effect of the original calculation error is smaller for the offset angles of these sensors. Correct lever-arm numbers are below for reference, new boresight numbers would need to be computed to use these.
    2626
    2727Corrected 2006/7 lever-arm numbers (use "wrong" numbers below unless you recompute boresight correction)