Changes between Version 5 and Version 6 of Status/Collection


Ignore:
Timestamp:
Apr 24, 2008, 12:12:33 PM (16 years ago)
Author:
gaew
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Status/Collection

    v5 v6  
    66
    77'''Note:''' ''the actual flight date is dependent on operational restrictions and the presence of suitable weather conditions. All data are collected on a "best endeavours" basis.''
    8 
    9 = Update of operational status for data collection =
    10 
    11 == 22nd April 2008 ==
    12 ''Following the fitting of a loaned engine the NERC ARSF aircraft has resumed support for UK remote sensing. During the first two weeks in May data collection time will be shared between the support of UK remote sensing and participation in an International experiment in support of science (EUCAARI - NL08/01). The Cambridge LiDAR should be available in the NERC aircraft at the end of May, just after the aircraft is refitted with the repaired engine.
    13 
    14 == 20th April 2008 ==
    15 Please contact Gary Llewellyn (Science / operations coordinator) if you have any questions or concerns: gaew@nerc.ac.uk (01865 374 391)
    168
    179''Please contact Gary Llewellyn (Science / operations coordinator) if you have any questions or concerns: gaew@nerc.ac.uk (01865 374 391)''