Opened 15 years ago

Closed 14 years ago

#264 closed flight processing (fixed)

Calibration, flight day 268a/2009, Little Rissington

Reported by: knpa Owned by: knpa
Priority: immediate Milestone: 2009 Data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by knpa)

Calibration/Boresight flight

Data location: ~arsf/arsf_data/2009/flight_data/arsf_internal/boresight_2009-268a_little_riss

Data arrived from ARSF via SATA disk F on 7th Oct 2009.

Sensors:

Eagle
Hawk
ALS50-II

Change History (19)

comment:1 Changed 15 years ago by knpa

  • Description modified (diff)

comment:2 Changed 15 years ago by knpa

  • Description modified (diff)

comment:3 Changed 15 years ago by knpa

  • Description modified (diff)

comment:4 Changed 15 years ago by mark1

Eagle files in wrong project.

Eagle files have been moved into GB08_08-2009_268b_Wytham_woods, replaced by the Eagle files from GB08_10-2009_268c_Denny_wood

comment:5 Changed 15 years ago by mark1

Hawk files all seem to have the wrong fps rate on hdr files. They should (I think) be at fps 15 not fps 30. Have created copies of the hdr files and edited them.

Lines 2,3,4,5,8,9,10 process ok (with sct offsets).

Lines 1, 6 and 11 don't process well and haven't tried hard to fix them - no runway on lines 6 and 11 so seems little point in wasting time.

Line 7 also does not contain the runway.

All lines are either N,S, E or W - no diagonals flown.

comment:6 Changed 15 years ago by mark1

SCT offsets for hawk:

line 2: 0.25

line 3: -1.48

line 4: -0.69

line 5: -0.81

line 8: 0.1

line 9: 0.22

line 10: 0.1

Some small timing offsets may still be present

comment:7 Changed 15 years ago by mark1

Hawk boresight values of: pitch=-0.23 roll=0.27 heading=0.0 appear to give a reasonable result given the data quality (high altitude, no diagonals).

comment:8 Changed 15 years ago by mark1

SCT offsets for eagle (small errors may still be present in some lines):

line 1: 0.4

line 3: 1.05

line 4: 0.45

line 5: 1.34

line 6: 1.03

line 9: 0.52

line 10: 1.55


line 11: 1.17

comment:9 Changed 15 years ago by mark1

tentative eagle boresight values: pitch=-0.32 roll=-0.52 heading=0.26

still moves around a bit but best we can get at the current time. Suggest testing them on some data to see how well they work out.

comment:10 Changed 15 years ago by knpa

  • Owner changed from knpa to mark1

LIDAR calibration completed.

comment:11 Changed 15 years ago by mggr

(also see comments above)

Re: #281 (Hawk frame rates are double what they should be), the following lines are affected and the .hdr file will need to be edited to halve the fps number:
{{
arsf_internal/boresight_2009-268a_little_riss/hawk/Hawk268-09-10.hdr: predicted length half recorded length, frame rate doubling problem?
arsf_internal/boresight_2009-268a_little_riss/hawk/Hawk268-09-11.hdr: predicted length half recorded length, frame rate doubling problem?
arsf_internal/boresight_2009-268a_little_riss/hawk/Hawk268-09-1.hdr: predicted length half recorded length, frame rate doubling problem?
arsf_internal/boresight_2009-268a_little_riss/hawk/Hawk268-09-2.hdr: predicted length half recorded length, frame rate doubling problem?
arsf_internal/boresight_2009-268a_little_riss/hawk/Hawk268-09-3.hdr: predicted length half recorded length, frame rate doubling problem?
arsf_internal/boresight_2009-268a_little_riss/hawk/Hawk268-09-4.hdr: predicted length half recorded length, frame rate doubling problem?
arsf_internal/boresight_2009-268a_little_riss/hawk/Hawk268-09-5.hdr: predicted length half recorded length, frame rate doubling problem?
arsf_internal/boresight_2009-268a_little_riss/hawk/Hawk268-09-6.hdr: predicted length half recorded length, frame rate doubling problem?
arsf_internal/boresight_2009-268a_little_riss/hawk/Hawk268-09-7.hdr: predicted length half recorded length, frame rate doubling problem?
arsf_internal/boresight_2009-268a_little_riss/hawk/Hawk268-09-8.hdr: predicted length half recorded length, frame rate doubling problem?
arsf_internal/boresight_2009-268a_little_riss/hawk/Hawk268-09-9.hdr: predicted length half recorded length, frame rate doubling problem?
}}}

comment:12 Changed 15 years ago by benj

3/2/10 - Rsynced back to repository, but left processed files out to save space (ie transferred scripts, applanix and other auxiliary files only).

comment:13 Changed 14 years ago by knpa

  • Owner changed from mark1 to knpa
  • Status changed from new to assigned
  • Summary changed from Calibration, flight day 268/2009, Little Rissington to Calibration, flight day 268a/2009, Little Rissington

Beginning archiving.

comment:14 Changed 14 years ago by knpa

500GB of various sct lev1 and lev3s present in workspace version. Tried to find the files with the correct scts based on figures above but the couldn't find any matches. Deleted all lev1s and lev3s.

comment:15 Changed 14 years ago by knpa

No applanix gps files present.

comment:16 Changed 14 years ago by knpa

No webcam data

No leica/logs

comment:17 Changed 14 years ago by knpa

Created tarball, awaiting download by NEODC.

comment:18 Changed 14 years ago by knpa

Transferred to, and backed-up by, NEODC.

Moved to archive disk.

comment:19 Changed 14 years ago by knpa

  • Component changed from Processing: general to Archiving
  • Resolution set to fixed
  • Status changed from assigned to closed

Deleted workspace version.

Closing ticket.

Note: See TracTickets for help on using tickets.