#269 closed flight processing (fixed)
GB08/15, flight day 278a, Eaves Wood
Reported by: | mark1 | Owned by: | knpa |
---|---|---|---|
Priority: | alpha 4 low | Milestone: | 2009 Data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by emca)
Data location: ~arsf/arsf_data/2009/flight_data/uk/GB08_15-2009_278a_Eaves_wood
Data arrived from ARSF via SATA disk L on 7th October 2009.
Scientific objective:/users/rsg/arsf/arsf_data/2008/ARSF_Applications/GB_and_NL/GB08-15 Science Case.pdf
Priority: alpha-4-Low
PI: A. Blackburn
Sensors:
- Eagle (02/06/2010)
- Hawk (02/06/2010)
- Leica LIDAR (02/06/2010)
Change History (20)
comment:1 Changed 15 years ago by mark1
comment:2 Changed 15 years ago by mark1
logsheet arrived and unpacked
comment:3 Changed 15 years ago by mark1
Have renamed hawk files from 278* and Hawk278* to SWIR278*
comment:4 Changed 15 years ago by mggr
Re: #281 (Hawk frame rates are double what they should be), the following lines are affected and the .hdr file will need to be edited to halve the fps number:
uk/GB08_15-2009_278a_Eaves_wood/hawk/SWIR278-09-10.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_15-2009_278a_Eaves_wood/hawk/SWIR278-09-11.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_15-2009_278a_Eaves_wood/hawk/SWIR278-09-1.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_15-2009_278a_Eaves_wood/hawk/SWIR278-09-2.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_15-2009_278a_Eaves_wood/hawk/SWIR278-09-3.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_15-2009_278a_Eaves_wood/hawk/SWIR278-09-4.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_15-2009_278a_Eaves_wood/hawk/SWIR278-09-5.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_15-2009_278a_Eaves_wood/hawk/SWIR278-09-6.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_15-2009_278a_Eaves_wood/hawk/SWIR278-09-7.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_15-2009_278a_Eaves_wood/hawk/SWIR278-09-8.hdr: predicted length half recorded length, frame rate doubling problem? uk/GB08_15-2009_278a_Eaves_wood/hawk/SWIR278-09-9.hdr: predicted length half recorded length, frame rate doubling problem?
comment:5 Changed 15 years ago by emca
- Owner set to emca
- Status changed from new to assigned
comment:6 Changed 15 years ago by emca
Renamed the eagle files from 278* to VNIR278*
Halved the fps number on the hawk header files. No sync for any of the hawk files.
comment:7 Changed 15 years ago by emca
LIDAR processing complete and ready for delivery check at
~airborne/workspace/GB08_15-2009_278a_Eaves_wood/delivery/20100525/GB08_15
comment:8 Changed 15 years ago by emca
Sct offsets:
Line No | Eagle | Hawk |
1 | +0.02 | -5.15 |
2 | -0.04 | -4.67 |
3 | +0.04 | -5.68 |
4 | +0.02 | -4.96 |
5 | +0.01 | -4.35 |
6 | +0.01 | -4.69 |
7 | -0.04 | -4.55 |
8 | -0.02 | -5.46 |
9 | +0.02 | -4.92 |
10 | +0.03 | -4.75 |
11 | -0.01 | -5.61 |
comment:9 Changed 15 years ago by emca
No dark frames from Hawk data - processed using dark frames from GB09/05 278c line 09
Hyperspectral processing complete and ready for delivery check at
~airborne/workspace/GB08_15-2009_278a_Eaves_wood/delivery/20100527/GB08_15
comment:10 Changed 15 years ago by mark1
LIDAR delivery checked. All looks good. Ready to deliver.
comment:11 Changed 15 years ago by mark1
Hyperspectral delivery checked. All data looks good, ready to deliver.
comment:12 Changed 15 years ago by emca
- Description modified (diff)
Hyperspectral and LiDAR data sent to PI 02/06/2010
comment:13 Changed 14 years ago by emca
- Component changed from Processing: general to Archiving
All data has been processed and rsync'd to
~arsf/arsf_data/2009/flight_data/uk/GB08_15-2009_278a_Eaves_wood
Ready for archiving.
comment:15 Changed 14 years ago by knpa
No webcam data for this project.
comment:16 Changed 14 years ago by knpa
Archiving preparation completed, awaiting NEODC transfer.
comment:17 Changed 14 years ago by knpa
Downloaded and backed up by NEODC.
Moved to archive disk.
comment:18 Changed 14 years ago by knpa
- Resolution set to fixed
- Status changed from assigned to closed
Deleted workspace version.
Closing ticket.
comment:19 Changed 8 years ago by lah
Archiving
Tidied and ready for upload to NEODC.
comment:20 Changed 8 years ago by asm
Archiving
Re-processed hyperspectral data has been archived and everythin is ready to be downloaded from CEDA. Will close this ticket.
Still awaiting flight logsheet.
DEM creation threw errors but created a DEM. Check it is good when processing.