Opened 15 years ago
Last modified 8 years ago
#285 closed flight processing
ET07/01, flight day 300b/2009, Afar south — at Version 14
Reported by: | benj | Owned by: | emca |
---|---|---|---|
Priority: | alpha 5 | Milestone: | 2009 Data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by mark1)
Data location: ~arsf/arsf_data/2009/flight_data/ethiopia/ET07_01-2009_300b_Afar_south
Data arrived from ARSF via SATA disk Y on 4th Nov. 2009.
Scientific objective: /users/rsg/arsf/arsf_data/2008/ARSF_Applications/Ethiopia/ET07_01\ -\ Dr\ Wright.pdf
Priority: alpha-5
PI: Tim Wright
2009 Ethiopia campaign, reflown from 2007
Sensors:
- Eagle (12/02/2010)
- Hawk (12/02/2010)
- Leica LIDAR (12/02/2010)
- Digital Photography (26/02/2010)
- TABI (to be processed by University of Athens)
Change History (14)
comment:1 Changed 15 years ago by benj
- Description modified (diff)
comment:2 Changed 15 years ago by benj
- Description modified (diff)
comment:3 Changed 15 years ago by mggr
- Description modified (diff)
Raw TABI data acquired, put in archive and offered to Athens for download and processing.
comment:4 Changed 15 years ago by emca
- Owner set to emca
- Status changed from new to assigned
comment:5 Changed 15 years ago by emca
Eagle and Hawk SCT offsets per line
Line | Eagle | Hawk |
1 | -0.08 | -0.06 |
2 | -0.05 | -0.04 |
3 | -0.04 | -0.06 |
4 | +0.02 | -0.07 |
5 | -0.01 | -0.05 |
6 | 0.00 | -0.05 |
7 | -0.03 | -0.07 |
8 | -0.04 | -0.04 |
9 | 0.00 | -0.08 |
10 | -0.05 | -0.07 |
11 | -0.02 | -0.03 |
12 | +0.02 | -0.01 |
13 | -0.05 | -0.01 |
14 | +0.02 | -0.07 |
15 | -0.06 | -0.08 |
comment:6 Changed 15 years ago by emca
Amended logsheet to contain correct Project Code (was entered as ET07-04)
comment:7 Changed 15 years ago by emca
Processing complete.
Hyperspectral data ready for delivery check at:
/users/rsg/airborne/workspace/ET07_01-2009_300b_Afar_south/delivery/20100125/
LIDAR ready for delivery check at:
/users/rsg/airborne/workspace/ET07_01-2009_300b_Afar_south/delivery/20100126/
comment:8 Changed 15 years ago by mark1
Photograph delivery created and checked. Ready to deliver.
comment:9 Changed 15 years ago by mark1
LIDAR delivery check: minor corrections made to read_me, all ascii files checked with check_ascii_lidar.sh and viewed in grass. Data looks good.
DEM header resolution and Read_me disagree, this needs to be checked as to which is correct. Also need to add some info into readme about SRTM data etc.
comment:10 Changed 15 years ago by emca
Re: LIDAR
Readme has been corrected.
Data now ready for delivery.
comment:11 Changed 15 years ago by knpa
Hyperspectral has been delivery checked.
All OK apart from:
- Contents list in readme doesn't include misc or bin folders and contents
- Quality of Data section - says we processed our lev3s with SRTM DEM; was actually SRTM and lidar(?)
- Geocorrection of Data section - should mention that we have included an SRTM/lidar DEM with the delivery.
- Need to add -es misc/sphsep15lx.grd to example azgcorr command
- Need to mention in Data Quality that Eagle is reguarly dropping scan lines
- Hawk 01 has a large number of dropped scan lines at the start of the line - all bands
comment:12 Changed 15 years ago by emca
Hyperspectral:
Read_me edited for above changes
Note:
- Misc directory not included as not required for delivery
- Data was quality checked using SRTM DEM
- -es NO used for sample azgcorr command
Data now ready for delivery
comment:13 Changed 15 years ago by emca
LIDAR and Hyperspectral sent to PI 12/02/2010
comment:14 Changed 15 years ago by mark1
- Description modified (diff)
Digital Photography dispatched to PI on 26/02/2010
Raw GPS base station data is in ~arsf/arsf_data/2009/flight_data/ethiopia/basestations.