#284 closed flight processing (fixed)
ET07/01, flight day 300a/2009, Afar north
Reported by: | benj | Owned by: | knpa |
---|---|---|---|
Priority: | alpha 5 | Milestone: | 2009 Data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by mark1)
Data location: ~arsf/arsf_data/2009/flight_data/ethiopia/ET07_01-2009_300a_Afar_north
Data arrived from ARSF via SATA disk Y on 4th Nov. 2009.
Scientific objective: /users/rsg/arsf/arsf_data/2008/ARSF_Applications/Ethiopia/ET07_01\ -\ Dr\ Wright.pdf
Priority: alpha-5
PI: Tim Wright
2009 Ethiopia campaign, reflown from 2007
Sensors:
- Eagle (26/02/2010)
- Hawk (26/02/2010)
- Leica LIDAR (26/02/2010)
- Digital Photography (26/02/2010)
- TABI (to be processed by University of Athens)
Change History (25)
comment:1 Changed 15 years ago by benj
- Description modified (diff)
comment:2 Changed 15 years ago by benj
- Description modified (diff)
Raw GPS base station data is in ~arsf/arsf_data/2009/flight_data/ethiopia/basestations.
comment:3 Changed 15 years ago by mggr
- Description modified (diff)
Raw TABI data acquired, put in archive and offered to Athens for download and processing.
comment:4 Changed 15 years ago by emca
- Owner set to emca
- Status changed from new to assigned
comment:5 Changed 15 years ago by mark1
Photograph delivery directory created. Photos 1-113 tagged by IPAS SOL file, 114-330 tagged using log file (since IPAS or LIDAR failed mid flight).
comment:6 Changed 15 years ago by mark1
Photographs checked and ready to deliver.
comment:7 Changed 15 years ago by emca
LIDAR processing is complete and ready for delivery checking at
~airborne/workspace/ET07_01-2009_300a_Afar_north/delivery/20100128
comment:8 Changed 15 years ago by emca
Eagle and Hawk SCT offsets per line
Line | Eagle | Hawk |
1 | -0.01 | -0.07 |
2 | +0.03 | +0.01 |
3 | -0.03 | -0.02 |
4 | +0.04 | 0.00 |
comment:9 Changed 15 years ago by emca
Hyperspectral processing complete and ready for delivery checking at
~airborne/workspace/ET07_01-2009_300a_Afar_north/delivery/20100215
comment:10 Changed 15 years ago by mark1
LIDAR delivery checked and all looks OK.
comment:11 Changed 15 years ago by mark1
Hyperspectral data delivery checked. Example commands tested with dem and work OK, all level 1 files checked and look good. Minor edits made to read-me file.
comment:12 Changed 15 years ago by mark1
- Description modified (diff)
Eagle, Hawk and LIDAR data delivered to PI on 26/02/2010
comment:13 Changed 15 years ago by mark1
- Description modified (diff)
Digital photography also delivered on 26/02/2010
comment:14 Changed 14 years ago by benj
Processed TABI data was received from Pol back in January but we weren't happy with the accuracy. This data is in the workspace, it has not been dispatched to the PI but is the only processed TABI data we currently have for this project.
comment:15 Changed 14 years ago by emca
- Component changed from Processing: general to Archiving
All data has been rsynced to
~arsf/arsf_data/2009/flight_data/ethiopia/ET07_01-2009_300a_Afar_north
Ready for archiving
comment:17 Changed 14 years ago by knpa
Some ipas files seem to be missing (intermediate files, usually in gps folder).
comment:18 Changed 14 years ago by knpa
Navigation data is a bit confusing.
For applanix, it looks like it was processed three times. Have separated proc data which appears to be related to previous runs into applanix/proc/sbet_old. However, data in applanix/extract and applanix/gps seem to relate to older runs only. Have left these as they are.
For ipas, the extract folder is odd in that all files have a modification time of June, four months after delivery. As mentioned before, the gps data is missing.
comment:19 Changed 14 years ago by knpa
Only 1 lidar line included in delivery.
From Readme:
"Please note that due to a technical fault, this delivery only includes LIDAR
data for line Nth3. The remaining lines (Nth5, Nth4 and Nth2) were re-flown
on day 301"
comment:20 Changed 14 years ago by knpa
hyperspectral delivery is missing overview screenshots (i.e. eagle/hawk mosaics).
comment:21 Changed 14 years ago by knpa
Finished preparing for archiving.
Larsen is currently full, so cannot create tarball yet.
comment:22 Changed 14 years ago by knpa
Sent to NEODC, and backed up by them.
Have moved out of repository, to archive disk.
comment:23 Changed 14 years ago by knpa
- Resolution set to fixed
- Status changed from assigned to closed
Deleted workspace copy.
Closing ticket.
comment:24 Changed 8 years ago by lah
Tidying
There is no reprocessed hyperspectral delivery, but there are reprocessed files, so I've created a new delivery out of these. There was a readme already generated so I've copied this into the directory. This will need a delivery check before archiving. I have not deleted any of the hyperspectral processing files yet - will wait until after the delivery is checked.
comment:25 Changed 7 years ago by asm
Archiving
Reprocessed hyperspectral archived under: http://data.ceda.ac.uk/neodc/arsf/2009/ET07_01/ET07_01-2009_300a_Afar_north/ET07_01-300a-hyperspectral-20161028/
It has not replaced the old delivery but all data is present so will mark the project as fixed.
The aircraft had an engine power-loss on landing, which meant the equipment got powered-down prematurely. This resulted in some of the Lidar data being corrupted. The affected data was re-flown on day 301.
Also, when I checked it in Ethiopia there was some corruption of the Applanix data (something bad in dcalm.005 I think it was). However, the Applanix data from flight 300b seems to also contain the data from 300a, so if there is a problem with the Applanix data from this flight then use the data from 300b.