Opened 14 years ago

Last modified 8 years ago

#345 closed flight processing

EU10/01, 178/2010, Tharandt — at Version 10

Reported by: jb362 Owned by: emca
Priority: alpha 5 Milestone: 2010 data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by emca)

Data Location: /users/rsg/airborne/workspace/EU10_01-2010_178_Tharandt

This project has not been fastcopied into the repository.

Data arrived from ARSF via network transfer on 05/07/2010.

Scientific objective: 1.Key impact factors on CO2 and H2O fluxes
1.1 examine the influence of within-site elevation changes using flux tower observations, airborne LiDAR data, and ecosystem models data (Loobos)
1.2 develop an approach to allocate CO2 and H2O fluxes to specific tree species of a mixed forest (Norunda)
1.3 assess the influence of forest thinning on CO2 uptake (Norunda)
1.4 evaluate above findings and test transferability of findings (Tharandt)
1.5 investigate the impact of storm damage (Tharandt)

  1. Reducing uncertainty in the upscaling of greenhouse gases

2.1. develop an approach to evaluate airborne flux measurements using flux tower data, footprint model and airborne LiDAR data (Loobos)
2.2 use airborne LiDAR data to validate GLAS/ICESat for different forest biomes, where accurate tree height and vegetation cover density will be co-located with GLAS footprints
2.3 evaluate the ability of GLAS spatial sampling density to represent the wider field site
2.4 develop an approach to model CO2 and H2O fluxes on a regional scale using GLAS/ICESat data and generate key driving parameters for land-surface models
2.5 evaluate whether regional CO2/H2O flux models driven by satellite optical data can be improved by the addition of tree height information from satellite LiDAR

Priority: a5

PI: N. Klujn
Sensors: ¶

  • Eagle
  • Hawk
  • Leica LIDAR
  • Photography (27/07/2010)

Change History (10)

comment:1 Changed 14 years ago by jb362

Base station data is now available for this project

comment:2 Changed 14 years ago by ella

This project has not yet been fast copied into the arsf repoistry.
IPAS navigation processing done.
Applanix navigation processing done.

comment:3 Changed 14 years ago by emca

  • Owner set to emca
  • Status changed from new to accepted

comment:4 Changed 14 years ago by emca

Starting LIDAR processing

comment:5 Changed 14 years ago by ella

Hyperspectral processing done and ready for checking at ~arsf/workspace/EU10_01-2010_178_Tharandt/delivery/20100726/EU10_01.

On the flight logsheet there were three lines named 'X2' but have been change to X2a X2b and X2c.

comment:6 Changed 14 years ago by emca

Photograph processing complete. Removed the following photographs from
the delivery as they were over/under exposed or not relevant to the project
001-055, 059, 096, 131, 155, 174, 191, 192, 207, 211, 222, 229, 230,
235, 246, 252, 267, 376, 380, 385, 389, 392

Ready for delivery check at
~airborne/workspace/EU10_01-2010_178_Tharandt/delivery/20100723/EU10_01

comment:7 Changed 14 years ago by ella

Starting the check for the RCD.

[Have removed 'camera' from the Delivery Checking/Processing Order wiki page for this project to avoid it being checked twice.]

comment:8 Changed 14 years ago by ella

Camera delivery check complete. All checks out apart from:

  • 5 Readmes - delete all apart form pdf
  • hidden .svn directory in doc directory - removed

comment:9 Changed 14 years ago by jb362

Starting hyperspectral delivery check

comment:10 Changed 14 years ago by emca

  • Description modified (diff)

Photography data sent to PI 29/07/2010

Note: See TracTickets for help on using tickets.